Similar Projects
HVAC and Boiler Systems Preventative Maintenance Services 2019
Post-Bid
Hartford, CT

Duct Cleaning Services
Post-Bid
New Fairfield, CT

HVAC, Hartford, CT
Results
Hartford, CT 06110

Sales Booth HVAC (H)
Results
Hartford, CT 06141

Cooling Tower Replacement and Sprinkler System Modification
Post-Bid
Seymour, CT

Todesign Replacement of Geothermal HVAC System at the Avon Free Public Library
Results
Avon, CT 06001

Heating Residential at 48 Convent Avenue
Post-Bid
Norwich, CT 06360

Replacement of the Air Handling Units at Amity Regional High School
Results
Less than $644,000 est. value
Woodbridge, CT 06525

West Woods Upper Elementary School Dehumidification Project
Post-Bid
Farmington, CT

Air Handling Units (AHU) - 10 Humidifier Replacement
Results
Less than $96,206 est. value
Farmington, CT

HVAC Preventive Maintenance Services
Post-Bid
Hartford, CT

Design and Build Stowe Early Learning Center HVAC Upgrade
Results
Enfield, CT 06082

Testing and Treatment of HVAC
Term Contract
Post-Bid
Bridgeport, CT 06606

A/C Duct Cleaning Services
Term Contract
Results
Greenwich, CT

Chillers Service Maintenance and Repairs
Term Contract
Post-Bid
Waterbury, CT 06706

Last Updated 10/29/2020 02:39 PM
Project Title

Z--HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) Maintenance and Repair Services and Direct Digital Controls (DDC)

Physical Address View project details and contacts
City, State (County) Groton, CT   (New London County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Heating, Ventilation and Air Conditioning Maintenance & Repair Services, New London Submarine Base Groton, CT. The work identified is to be provided by means of a combination Firm-Fixed Price (recurring work)/Indefinite Quantity (non-recurring work) type of contract. Source Selection procedures will be used to select the proposal that provides the best value to the government. Offers will be evaluated using the tradeoff source selection process. The tradeoff source selection process allows for a tradeoff between non-cost/price factors (i.e., technical, past performance, experience and safety) and cost/price and allows the Government to accept other than the lowest priced proposal or other than the highest technically rated proposal to achieve a best-value contract award.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents