Similar Projects
RFQ - ADA Compliance for Various Kansas City Water Buildings
Term Contract
Conception
Kansas City, MO 64106

Grit Removal Improvements - Rock Creek Pump Station - 302401 - City of Independence
Renovation
Conception
$977,500 CJ est. value
Independence, MO 64050

Disinfection Wastewater Treatment Plant - City of Kirksville
Renovation
Design
$1,100,000 CJ est. value
Kirksville, MO 63501

Protective Coating Systems Replacement at the Courtney Bend Treatment Water Plant
Infrastructure
Bidding
$370,000 CJ est. value
Sugar Creek, MO 64058

Orb Gate Replacement
Renovation
Bidding
$50,000 CJ est. value
Belton, MO 64012

Wastewater System Improvements
Renovation
Post-Bid
$1,600,000 est. value
Greenfield, MO

WWTP Snail Removal Structure Renovation
Renovation
Post-Bid
$360,000 est. value
Monett, MO

Missouri River WWTF Digester Gas Storage Cover Replacement
Renovation
Results
$1,624,000 est. value
Saint Louis, MO

Wastewater Treatment Plant Improvements
Renovation
Results
Lone Jack, MO

Wastewater Treatment Facility Headworks Repairs - 2022
Infrastructure
Construction
$276,467 CJ est. value
Kansas City, MO 64152

2021 Bond - City of Warrenton
Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Warrenton, MO 63383

Nutrient Removal - Rock Creek Treatment Plant - 302502 - City of Independence
Renovation
Conception
$3,000,000 CJ est. value
Independence, MO 64053

Wastewater Treatment Plant Improvements at the Business and Technology Park
New Construction
Post-Bid
$7,002,000 est. value
Sikeston, MO

Hickory Trails WWTF Upgrades
Renovation
Results
MO

Wastewater Treatment Plant Repair Project
Renovation
Post-Bid
$3,000,000 est. value
Boonville, MO

Last Updated 06/01/2023 11:35 AM
Project Title

RFQ D/B - Blue River Wastewater Treatment Plant (WWTP) Biosolids Facility Project

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64120   (Jackson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Questions. Forward all questions by email to the following Project Manager and Contract Administrator. Questions received less than ten (10) days prior to the Submittal Date may not be answered. Interpretations or clarifications considered necessary by the Project Mdnesday, August 10, 2022 at 12:00pm, anager in response to such questions will be issued by Addenda to all Design-Builders. Oral or other interpretations or clarifications shall be without legal effect, even if made during formal meetings. Isaac Garlington, Project Manager 4800 East 63rd Street, Kansas City, MO 64130 Phone: (816) 513-0436 E-mail: isaac.garlington@kcmo.org Derrick Smith, Procurement Officer Procurement Services, General Services Department 414 East 12th Street, City Hall 1st Floor-RM 102W Kansas City, MO 64106 (816) 513-0807 Phone (816) 513-2812 Fax Email: derrick.smith@kcmo.org DesignBuilders should submit six (6) spiral bound copies of their SOQs, and one (1) electronic version of the SOQ on a USB flash drive (in indexed and searchable PDF format). All SOQs must be submitted in a sealed envelope or box and shall not be opened until after the due date. The SOQ document package shall be plainly labeled with the words "STATEMENT OF QUALIFICATIONS FOR BLUE RIVER SCREEN HOUSE FACILITY PROJECT". The City reserves the right at any time to change or extend the due date and time for any reason. Each Design-Builder assumes full responsibility for the timely delivery of its SOQ at the required location. Any SOQ received after the submittal deadline will be deemed nonresponsive and returned unopened to the Design-Builder, and that Design-Builder will be eliminated from consideration. A delivery acknowledgement will be issued upon receipt of the SOQ package and will be provided to the Design-Builder via e-mail by the City's Project Manager. The cost for design and construction of the Project is currently estimated at $5 million. This budget does not include the City other Project costs, such as professional advisory services, site investigations, environmental studies, certain governmental approvals, taxes, and other related costs. The Project may be financed through a combination of City municipal revenue bonds and cash on-hand. o Shortlist Selection Date (provisional)* September 2, 2022 o Issuance of RFP (provisional) September 7, 2022 o Deadline for Receipt of Written Questions October 26, 2022 o Proposal Submission (provisional) November 9, 2022 o Notice of Intent to Contract (provisional) December 28, 2022

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents