Similar Projects
Construction of 10 New ADA Parking Spaces at Forsyth County Courthouse
Infrastructure
Bidding
Cumming, GA 30040

Greenway Trail Phase IV
Infrastructure
Bidding
Less than $165,000 est. value
Douglas, GA

Blakely Gateway Project
Post-Bid
$700,000 est. value
Blakely, GA 31723

Annual Contract for Sidewalk Construction Services
Term Contract
Post-Bid
Hampton, GA 30228

Xpress West Douglas and Panola Park and Ride Lot Granite and Concrete Repair Work
Results
Stockbridge, GA 30281

Jesters Creek Trail Phase III
Results
Morrow, GA 30260

Resurfacing Bundle and Sidewalk Improvements
Infrastructure
Bidding
$800,000 est. value
Ashburn, GA

2019 CDBG Sidewalks
Post-Bid
Less than $600,000 est. value
Brunswick, GA 31520

West Jones Bridge Pedestrian Crossing
Results
Peachtree Corners, GA 30092

Robert Mccorkle Bike Trail Improvements
Infrastructure
Bidding
Savannah, GA 31410

Americus Pedestrian Improvements Along US 19
Post-Bid
Americus, GA 31709

Bear Creek Water Treatment Plant Sedimentation Basin Walkways
Results
Less than $348,807 est. value
Douglasville, GA 30134

Sidewalk Improvements - Maxham Road (SPLOST)
Infrastructure
Bidding
Douglasville, GA 30134

Centralhatchee Parkway Sidewalk
Post-Bid
Centralhatchee, GA

Tarboro Fire Station 18 Parking Lot
Results
White Oak, GA 31568

Last Updated 11/08/2021 06:45 AM
Project Title

Sidewalk Replacement Project - Lions Gate Subdivision Phase II

Physical Address View project details and contacts
City, State (County) Savannah, GA 31419   (Chatham County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of the replacement of approximately 2,103’ of concrete sidewalk, 89’ of curb and gutter, 32 SY of concrete driveway aprons (minimum 4” thick or match existing whichever is greater), along with the removal of 38 trees and stump grinding in the Lions Gate Neighborhood.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents