Similar Projects
Water Filtration System
Renovation
Bidding
$600,000 CJ est. value
Woodburn, OR 97071

On-Call Trade Services for Prevailing Wage Projects
Term Contract
Post-Bid
OR

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Commercial Plumbing Service
Alteration
Results
OR

Tri-City Water Resource Recovery Facility ("WRRF") Fill Removal
Infrastructure
Results
$662,500 CJ est. value
Oregon City, OR 97045

Plumbing Supplies - EOCI
Term Contract
Post-Bid
Umatilla, OR 97882

Philomath Water Treatment Plant Improvements, Phase I
Infrastructure
Results
$4,161,000 CJ est. value
Philomath, OR 97370

Two Rivers Correctional Institution (TRCI) EVAC System Part Upgrade
Term Contract
Post-Bid
Umatilla, OR 97882

Water System Improvements - Phase II - Collector Well No. 3 Pump Station, Booster Pump Station and 1 Million Gallon Reservoir
Infrastructure
Results
$10,207,115 CJ est. value
Boardman, OR 97818

Plumbing Services
Term Contract
Post-Bid
Salem, OR 97301

Wastewater Treatment Plant Improvements
Infrastructure
Results
$5,250,000 CJ est. value
Falls City, OR 97344

On-Call Plumbing Services and Preventive Maintenance
Term Contract
Post-Bid
Gresham, OR 97030

Shasta 975 Storage Tanks
New Construction, Infrastructure
Results
$1,812,500 CJ est. value
Eugene, OR 97405

Gates Water Meter Procurement Project.
Infrastructure
Post-Bid
$650,000 CJ est. value
Gates, OR 97346

Water Storage Tank Improvement
Infrastructure
Results
$904,600 CJ est. value
Waldport, OR 97394

Last Updated 09/20/2023 02:04 AM
Project Title

Bradford Island Fish Ladder Exit Dredging FY2024

Physical Address View project details and contacts
City, State (County) Cascade Locks, OR 97014   (Hood River County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $656,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This is a Solicitation for the Bradford Island Fish Ladder Exit Dredging Fy2024. The U.S. Army Corps of Engineers, Portland District, has a requirement to perform clamshell dredging at Bonneville Lock and Dam, Bradford Island in Oregon and optional work at Bonneville Lock and Dam, Bonneville Spillway in Oregon. Please see the attached solicitation for details on the specifications of the requirement. The of this project consists of the Contractor furnishing all supervision, engineering, labor, materials, and equipment to perform the following work in strict accordance with the detailed requirements of this contract. OF CONSTRUCTION: Between $500,000 AND $1,000,000. Point of Contact: The USACE-NWP Contracting Office will be the sole point of contact for this action. Email responses to: Kristel Flores at kristel.m.flores@usace.army.mil and Andrea Smothers at andrea.k.smothers@usace.army.mil. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents