Similar Projects
Fire Training Classroom Building
New Construction - 10,000 SF
Conception
$1,500,000 est. value
Jonesboro, GA 30238

Design Build Services for Macon Bibb Fire Training Complex
New Construction
Design
$2,800,000 est. value
Macon, GA 31201

City of Metter Fire and Rescue Station
New Construction
Design
Metter, GA

Fire Station 15
New Construction - 12,342 SF
Bidding
Ball Ground, Canton, GA 30107

Fire Station 15
New Construction - 12,342 SF
Bidding
Ball Ground, Canton, GA 30107

Inspections, Maintenance, Service, Repair and Reports for the Fire Training Tower at Fort Gordon, GA.
Post-Bid
Fort Gordon, GA

Construction of Fire Station No. 7
New Construction - 1,500 SF
Post-Bid
Less than $5,068,409 est. value
Decatur, GA 30030

Aircraft Rescue Firefighting Facility Renovation
Renovation - 6,403 SF
Results
$2,486,000 est. value
Atlanta, GA 30336

Construction of Fire Station No.13
Results
Lawrenceville, GA 30042

Construction of New Fire Station 2
New Construction
Construction
$2,997,577 est. value
Augusta, GA

Construction of New Fire Station 20
New Construction
Construction
Hephzibah, GA 30815

New Fire Station 1
New Construction
Design
$6,425,000 est. value
Hinesville, GA 31313

Miller Park Fire Station
New Construction - 23,864 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Hinesville, GA 31313

Fire Station Design - Build
New Construction
Post-Bid
Hartwell, GA 30643

Savannah Regional Police Academy Expansion
Addition - 7,442 SF
Results
Savannah, GA

Last Updated 01/31/2022 08:21 AM
Project Title

New Hinesville Fire Station

Physical Address View project details and contacts
City, State (County) Hinesville, GA 31313   (Liberty County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Construction of two new buildings, a 17,000 SF fire house and a 5,500 SF administration building, and associated site work. The fire house is a combination of load bearing CMU and steel framing, is 2-stories, and contains five apparatus bays on the first floor and fire fighter living quarters on the second floor. The admin building is wood framed and contains offices and a training room for the fire department. This project will be constructed in phases. The new 2-story fire house and associated site work will be constructed first, in Phase 1, on the southern portion of the site. There is an existing fire station located on the northern portion of the site, which must remain operational until the new fire house is complete. Once the new fire house is complete (Phase 1), the Owner will relocate into the new facility. In Phase 2 the existing fire station will then be demolished, and the new admin building will be constructed on the northern portion of the site. The existing fire station contains asbestos containing material, which must be properly abated during demolition.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents