Similar Projects
Millspring Village Subdivision
New Construction, Infrastructure
Conception
$44,000,000 CJ est. value
Greenville, SC 29617

Zoo Walkway Repaving - City of Greenville
Infrastructure
Conception
$366,500 CJ est. value
Greenville, SC 29601

The Alliance
New Construction, Infrastructure - 33,000 SF
Design
$15,000,000 CJ est. value
Greenville, SC 29607

Repave Basketball Court, Needmore Center
Infrastructure
Design
$32,000 CJ est. value
Greer, SC 29650

Walking Trail Improvements at Mauldin City Park
Infrastructure
Bidding
$75,000 CJ est. value
Mauldin, SC 29662

City Barbeque / Greenville
New Construction, Infrastructure - 3,850 SF
Bidding
$1,000,000 CJ est. value
Greenville, SC 29607

Inland Port Greer, East and West Container Yard Expansion
Infrastructure
Post-Bid
$600,000 CJ est. value
Greer, SC 29651

CU-ICAR Flex Lab One Project
Renovation, Infrastructure - 80,000 SF
Post-Bid
$6,500,000 CJ est. value
Greenville, SC 29607

Burger King Force Main Jack and Bore
Infrastructure
Results
Greenville, SC

Bethany Tank Water Supply Improvements
Infrastructure
Results
$995,379 CJ est. value
Laurens, SC 29360

Leo Living Cottages Multi Residential
New Construction, Infrastructure - 3,000 SF
Construction
$125,000,000 CJ est. value
Greer, SC 29651

BridgeWay Station Mixed-Use / Mauldin
New Construction, Infrastructure - 300,000 SF
Construction
$100,000,000 CJ est. value
Simpsonville, SC 29681

Parkers Summit Subdivision
New Construction, Infrastructure
Pending Verification
$66,000,000 CJ est. value
Greenville, SC 29601

Michelin Tire Manufacturing Facility Expansion
Addition, Demolition, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Greenville, SC 29605

Laurens Road Swamp Rabbit Trail (SRT) - City of Greenville
Infrastructure
Conception
$1,500,000 est. value
Greenville, SC 29613

Last Updated 03/20/2023 01:38 AM
Project Title

Armstrong Elementary Playground Equipment and Installation

Physical Address View project details and contacts
City, State (County) Greenville, SC 29617   (Greenville County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $210,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

After issuance of a purchase order, the awarded vendor shall start work no sooner than June 3, 2023 and be completed by June 30th, 2023 Questions or comments regarding this solicitation document or the process shall be forwarded, in writing, to Ms. Elizabeth D. McDavid, Buyer I and Ms. Tonya Stroud, Senior Buyer, 2 Space Drive, Taylors, South Carolina 29687. Email addresses are: emcdavid @greenville.k12.sc.us and tstroud@greenville.k12.sc.us. Inquiries and comments shall be delivered to the Procurement Department no later than March 7, 2023, at 10:00 A.M. EST. Verbal questions/comments shall not be addressed at any time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents