Similar Projects
East of Sugar Creek on US 24 and Goes East 3.08 Miles including a 3P Milling and Resurfacing of US 24 Including Drainage and ADA Improvements
Infrastructure
Bidding
IL

East of Sugar Creek on US 24 and Goes East 3.08 Miles including a 3P Milling and Resurfacing of US 24 Including Drainage and ADA Improvements
Infrastructure
Bidding
IL

Central Division - Asphalt Paving Maintenance
Post-Bid

Furn to Stockpile 5,312 Ft Pipe Culv CL C TY 1 (15"-78" EQRS) 97 Each Band CL C TY 1 (15"24") 5 Each End Section CL C TY 1 (36"-54" EQRS)
Post-Bid
Watseka, IL

3P Milling and Resurfacing (Designed Overlay) and ADA Improvements
Results
Watseka, IL 60970

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Roadway Widening
Infrastructure
Bidding
Sheldon, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

6 Miles of Milling, Resurfacing, and ADA Improvements on US 45 from North Street in Buckley to Jefferson Street in Loda. 1 Foot Saftey Shoulders will be Added to the Rural Section Between Buckley and Loda.
Results
IL

Road Repair
Infrastructure
Bidding
Watseka, IL

Bayles Lake HOA Hydropneumatic Storage Tank and Treatment Building
New Construction, Renovation, Alteration
Post-Bid
Loda, IL

3.85 miles of shoulder widening and rumble strip installation on IL 1 from 150 feet west of W Circle Dr in St Anne in Kankakee County to E 3100N Rd
Results

Culvert Materials
Infrastructure
Bidding
Watseka, IL

District 3, Buckley Maintenance Facility
Results
IL

Milling and Resurfacing I-57 Interstate and Buckley Interchange Ramps
Infrastructure
Bidding
IL

Last Updated 02/21/2022 04:51 PM
Project Title

Road Improvements

Physical Address View project details and contacts
City, State (County) Onarga, IL   (Iroquois County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $98,986
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Group IV Work Includes Earth Excavation 298 Cu Yd; Geotech Fab f/Gr Stab 1,070 Sq Yd; Topsoil f&p 4 407 Sq Yd; Erosion Contr Blanket 407 Sq Yd; Agg Bse Cse b 10 1,070 Sq Yd; Bit Matls Pt Ct 43.5 Pound; p Bit Matls c&s Ct 176.4 Pound; Cover Coat Agg 26 Ton; Seal Coat Agg 28 Ton; Pavement Rem 1,070 Sq Yd.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents