Similar Projects
Trailside at Everett Park Phase II
New Construction, Infrastructure
Conception
$3,800,000 CJ est. value
South Haven, MI 49090

Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

Currie Parkway Bridge: Rehabilitation - City of Midland
Renovation, Alteration
Conception
Less than $460,000 est. value
Midland, MI 48640

Pedestrian Tunnel Replacement (underneath South Lakeshore Drive) - Lakeshore Park - ENG084 - City of Novi
Alteration
Conception
$507,530 est. value
Novi, MI 48377

Streambank Stabilization - Middle Rouge River (Near Meadowbrook Lake) - 133-08
Alteration
Conception
$1,469,656 est. value
Novi, MI

Maple Lane Resurfacing - 14 Mile Road to Volpe - City of Sterling Heights
Infrastructure, Alteration
Conception
$1,800,000 est. value
Sterling Heights, MI 48312

College Avenue - Leonard Street to Sweet Street - City of Grand Rapids
Infrastructure, Alteration
Conception
$542,180 est. value
Grand Rapids, MI 49505

Construct New Addition to Transit Administrative Building - City of Battle Creek
Addition, Infrastructure
Conception
$16,400,000 CJ est. value
Battle Creek, MI 49014

Housing Commission: 309 S Ashley - MF-CB-22-04 - City of Ann Arbor
New Construction, Infrastructure
Conception
$130,000,000 CJ est. value
Ann Arbor, MI 48103

Soccer Complex to Coolidge Road - City of East Lansing
Infrastructure
Conception
$600,000 est. value
East Lansing, MI

Parking Lot Resurfacing and Entry Drives / East Lansing Soccer Complex
Infrastructure
Conception
$325,000 CJ est. value
East Lansing, MI 48823

Runway Safety Extension - TR-AP-10-04 - City of Ann Arbor
Addition, Infrastructure
Conception
$4,726,000 CJ est. value
Ann Arbor, MI 48108

South End Development (1901 S. Trumbull St.) - Bay City
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Bay City, MI 48708

Union Street Dam Improvements - 168-19-CIP - City of Traverse City
Renovation, Infrastructure
Conception
$19,600,000 CJ est. value
Traverse City, MI 49684

Fuller Pool Spray Park - MF-PR-10-15 - City of Ann Arbor
New Construction, Infrastructure
Conception
$800,000 CJ est. value
Ann Arbor, MI 48105

Last Updated 11/01/2022 12:31 PM
Project Title

East Pipeline Culvert Replacement Project

Physical Address View project details and contacts
City, State (County) Felch Township, MI 49834   (Dickinson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work, East Pipeline Culvert Replacement Project, Michigan Dept. of Natural Resources - Forestry Division, includes soil erosion and sediment control, temporary damning the unnamed tributary stream and bypass pumping water, removal of an existing failed 24" CMP culvert, excavation for installation of a new 102-inch Aluminum or Concrete culvert meeting design requirements for HS-93 Loading, backfill of new culvert as depicted in the design documents, reconstruction of East Pipeline Road, guardrail installation and site restoration. Contractor to submit culvert design to engineer for approval. This project is located in Felch, Michigan where the unnamed creek crosses the East Pipeline Road. The existing culvert has failed. The MDNR FRD is proposing to remove the existing culvert. A new 8.5-foot diameter culvert is proposed to replace the existing undersized 2-foot diameter culvert. The project includes removal of existing metal culvert at the East Pipeline Road Creek Crossing. Installation of a new aluminum or concrete culvert, headwalls and wingwalls, roadwork regrading and shaping, earthwork excavation and backfilling and stream bypassing and grading, and restoration. Accepting Questions Until: October 19, 2022 Completion- Substantial Completion 7/31/2023 Final Completion 8/31/2023 P.E. No.: 64048

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents