Similar Projects
Lincoln Avenue South of Wascher Drive To South of Killarney - City of Urbana
Infrastructure
Conception
$1,930,550 CJ est. value
Urbana, IL 61801

Pennslyvania Avenue West Of Orchard Street Resurfacing To Race - City of Urbana
Infrastructure
Conception
$617,150 CJ est. value
Urbana, IL 61801

Murphy Oil #7109/7846 / Belvidere
Demolition, New Construction, Infrastructure - 1,400 SF
Design
$2,000,000 CJ est. value
Belvidere, IL 61008

Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

New Runway 4 and 22 FAA PAPIs
Infrastructure
Bidding
$759,228 CJ est. value
Savoy, IL 61874

Resurfacing, Patching, ADA Improvements, Guardrail Improvements, Detector Loop Replacement and Earth Excavation on US 40
Infrastructure
Bidding
$9,998,498 CJ est. value
Greenville, IL 62246

Concrete Replacement Work at Indian Hills (IL 16-1)
Infrastructure
Post-Bid
$130,000 CJ est. value
Quincy, IL 62301

Shimer Square Phase 1A
Term Contract, Infrastructure, Renovation - 49,875 SF
Post-Bid
Mount Carroll, IL 61053

LED Street Lights Delivery & Install
Infrastructure
Results
$126,900 est. value
Quincy, IL

4th Street Reconstruction, Drainage and Water System Improvements
Infrastructure
Results
$709,800 CJ est. value
Milledgeville, IL 61051

Hotel Royer Tapestry Collection by Hilton
Renovation, Infrastructure
Construction
$8,693,115 CJ est. value
Urbana, IL 61801

Interchange Reconstruction: I-57
Demolition, New Construction, Infrastructure
Construction
$125,999,995 CJ est. value
Champaign, IL 61822

Windsor Road Resurfacing
Infrastructure
Pending Verification
$300,000 CJ est. value
Urbana, IL 61801

General Mills Distribution Center
New Construction, Infrastructure - 1,300,000 SF
Pending Verification
$80,000,000 CJ est. value
Flora Township, IL 61008

New Fire Station #2 - 40805 - City Of Urbana
New Construction, Infrastructure
Conception
$2,741,400 CJ est. value
Urbana, IL 61802

Last Updated 01/04/2023 02:02 PM
Project Title

Installation of Flashing Yellow Arrows, Replacement of All Signal Cabinets and Connectivity Improvements Along the US 45

Physical Address View project details and contacts
City, State (County) Metropolis, IL 62960   (Massac County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Request for Qualifications, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of flashing yellow arrows, replacement of all signal cabinets and connectivity improvements along the US 45 corridor; intersection of US 45 and Devers Road as well as both ramp locations at the I-24 interchange. Region 5 District 9 Federal Project # HSIPFEL6(598) County(s) Massac Key Route(s) FAP 889 Marked Route(s) US 45 Section(s) 101TS-2 State Job #(s) C-99-045-21 PPS #(s) 9-02200-3220 VBP% 0.00 Completion Date: 15 Working Days Questions not accepted as of April 19, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 08, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 076 - Installation of Flashing Yellow Arrows, Replacement of All Signal Cabinets and Connectivity Improvements Along the US 45

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents