Similar Projects
83 - 85 Marshall Street Multi-Family
New Construction, Renovation
Design
$1,131,600 CJ est. value
Fitchburg, MA 01420

Railroad Lofts Renovations
Renovation
Design
Worcester, MA 01604

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - Hopkinton-Westborough - Interchange Improvements, Interstate 495 (NB and SB) at Interstate 90 (EB and WB)
Infrastructure
Post-Bid
$339,185,107 CJ est. value
Hopkinton, MA 01748

RFQ D/B - Hopkinton-Westborough - Interchange Improvements, Interstate 495 (NB and SB) at Interstate 90 (EB and WB)
Infrastructure
Post-Bid
$339,185,107 CJ est. value
Hopkinton, MA 01748

Resurfacing and Related Work on a Section of Route 140 (Greenstreet)
Infrastructure
Results
$1,590,471 est. value
Gardner, MA

Interstate Maintenance and Related Work on I-90
Infrastructure
Results
$22,542,465 est. value
Brimfield, Palmer, Warren, Wilbraham, MA

Southbridge-Wells Middle School Apartments
Renovation - 118,642 SF
Construction
$21,300,000 est. value
Southbridge, MA 01550

Moran Square Redevelopment
New Construction, Renovation
Construction
$21,900,000 est. value
Fitchburg, MA

Salisbury Pine Tree Estates
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Holden, MA 01520

Salisbury Pine Tree Estates
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Holden, MA 01520

Street Sweeping and Hauling / DPWP
Term Contract
Post-Bid
Worcester, MA

New Braintree Road Improvements Project
Alteration
Results
$444,870 est. value
Gilbertville, MA

Chandler Street Apartments
New Construction - 43,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Worcester, MA

Last Updated 03/08/2023 11:09 AM
Project Title

Salisbury Hill CCRC

Physical Address View project details and contacts
City, State (County) Worcester, MA 01609   (Worcester County)
Category(s) Heavy and Highway, Residential, Sewer and Water
Sub-Category(s) Apartments/Condominiums, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $43,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 114 age-restricted condominium units, 94 single-family units and 10 duplexes, with associated roadways, utilities, and storm water infrastructure. As of March 8, 2023, no permits have been submitted for review to the City of Worcester. A firm timeline for construction has not been confirmed.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents