Similar Projects
Chauncey Bikeways
Infrastructure
Design
$2,224,230 CJ est. value
Athens, OH 45701

Chauncey Bikeways
Infrastructure
Design
$2,224,230 CJ est. value
Athens, OH 45701

Stimson Avenue Waterline Extension
Infrastructure
Bidding
$170,030 CJ est. value
Athens, OH 45701

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

MWS-150 Oil
Infrastructure
Post-Bid
$500,000 est. value
Athens, OH

Village of Coolville - Street Improvements
Infrastructure
Results
$60,000 est. value
Coolville, OH

Village of Glouster Street Improvements
Infrastructure
Results
$258,800 est. value
Glouster, OH 45732

US Route 33, US Route 50 Interchange Improvement - County of Athens
Infrastructure
Construction
$7,000,000 CJ est. value
Athens, OH 45701

US Route 33, US Route 50 Interchange Improvement - County of Athens
Infrastructure
Construction
$7,000,000 CJ est. value
Athens, OH 45701

Kershaw Greene Apartments Phases III & IV
New Construction, Infrastructure
Pending Verification
$32,000,000 CJ est. value
Athens, OH 45701

Kershaw Greene Apartments Phases III & IV
New Construction, Infrastructure
Pending Verification
$32,000,000 CJ est. value
Athens, OH 45701

Family Dollar Store / New Marshfield
New Construction, Infrastructure - 8,800 SF
Design
$2,000,000 CJ est. value
New Marshfield, OH 45766

Chip Seal Bid
Infrastructure
Post-Bid
$60,000 est. value
Albany, OH

NPHC Garden 2021
Infrastructure
Results
$310,000 est. value
Athens, OH

University Estates Medical Office Building
New Construction, Infrastructure - 1,500 SF
Pending Verification
$900,000 CJ est. value
Athens, OH 45701

Last Updated 07/07/2023 05:34 AM
Project Title

RFP D/B - Bridge Replacements

Physical Address View project details and contacts
City, State (County) Athens, OH 45701   (Athens County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,044,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This is a Design Build project for the replacement of a single span bridge at TR83-1.40 (Jeffers Rd) and a single span bridge at TR471-0.01 (Allison Rd) including reconstruction of approach roadways. The Engineer's Estimate of Construction Cost for the project is $1,050,000.00. DBE GOAL: 9% Each bid shall contain the full name and address of each person or company interested in the same and must be accompanied by either a bid bond in the amount of 100 percent (100%) of the bid amount with a surety satisfactory to Athens County and The Ohio Department of Transportation (ODOT), or by certified check, cashier's check, or a letter of credit upon a solvent bank in the amount of not less than ten percent (10%) of the bid amount in favor of the aforesaid County and ODOT, conditioned that if the bid is accepted, a contract will be entered into within ten (10) days after notice of acceptance. Bid Bonds shall be accompanied by Proof of Authority of the official or agent signing the bond. A performance bond of one hundred percent (100%) of the amount of the contract with a satisfactory surety company, conditioned according to law, will be required for the faithful performance of the contract. The bidder will be required to describe in full detail as to their experience in this class of work, and bids from contractors inexperienced in this particular type of work will not be considered. Bidders must comply with the Federal Davis-Bacon Wages. The work shall commence upon written notice of award by Athens County. The owner intends and requires that this project be completed no later than October 31, 2024. The Board of County Commissioners of Athens County, Ohio reserves the right to reject any and/or all bids and to waive informalities as may be in the best interest of Athens County. The work for which design build proposals are invited consists of the replacement a single span bridge at TR83-1.40 (Jeffers Rd) and a single span bridge at TR471-0.01 (Allison Rd), including reconstruction of approach roadways, and other miscellaneous items associated with the ATHTR83/TR471-1.40/0.01 BRIDGE REPLACEMENTS PROJECT. The Engineer's Estimate of Cost for the project is $1,050,000.00. The bidder must hold a current prequalification with the Ohio Department of Transportation for the appropriate items of work, and must maintain such prequalification during the course of the contract. The LPA has determined that a pre-bid meeting will not be offered for the Project.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents