Similar Projects
Journal Squared
New Construction - 36,000 SF
Conception
$666,000,000 est. value
Jersey City, NJ

Mission 50
New Construction, Addition
Conception
Hoboken, NJ 07030

Journal Squared - Phase III
New Construction - 14,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Jersey City, NJ

Journal Squared - Phase III
New Construction - 14,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Jersey City, NJ

Academy Street Residences
New Construction - 4,000 SF
Post-Bid
$1,000,000 est. value
Jersey City, NJ 07306

Mandalay on the Hudson
New Construction, Renovation, Demolition - 2,280 SF
Post-Bid
Jersey City, NJ 07310

FY2020 CDA Roads - 42nd Street and 47th Street
Results
Union City, NJ 07087

Johnston Avenue Road Improvements
Results
Jersey City, NJ 07307

One Journal Square
New Construction - 533,987 SF
Construction
$80,000,000 est. value
Jersey City, NJ 07306

One Journal Square
New Construction - 533,987 SF
Construction
$80,000,000 est. value
Jersey City, NJ 07306

Romaine Avenue Apartment Building
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Jersey City, NJ 07306

Romaine Avenue Apartment Building
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Jersey City, NJ 07306

Grand Street Apartments
New Construction - 400 SF
Conception
Less than $500,000 CJ est. value
Hoboken, NJ

South Cove Hotel
New Construction
Design
Bayonne, NJ

John F. Kennedy Boulevard Mixed Use
Renovation, Addition - 1,741 SF
Post-Bid
Jersey City, NJ 07307

Last Updated 08/29/2022 11:04 AM
Project Title

Monitor Street Apartment

Physical Address View project details and contacts
City, State (County) Jersey City, NJ 07304   (Hudson County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected January 2021
Bids Due View project details and contacts
Estimated Value $22,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 29, 2022, construction is underway. Information regarding the general contractor has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

71,539 SF - Apartments/Condominiums, 8 Stories Above Grade, 68,647 SF New Construction, 70 Unit(s), Parking Garage, 2,892 SF New Construction, 5 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents