Similar Projects
Shift or Reconfigure Existing Taxiway - Fort Wayne Allen County Airport Authority
Infrastructure
Conception
$895,148 est. value
Fort Wayne, IN 46825

Murphy #6931 / Ft. Wayne
Demolition, New Construction, Infrastructure - 2,800 SF
Conception
$1,500,000 CJ est. value
Fort Wayne, IN 46802

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

HMA Overlay, Preventive Maintenance
Infrastructure
Design
$3,281,000 CJ est. value
Washington, IN 47501

Intersection Improvement With New Signals
Infrastructure
Bidding
$1,001,799 CJ est. value
Columbus, IN 47201

Intersection Improvement With New Signals
Infrastructure
Bidding
$1,001,799 CJ est. value
Columbus, IN 47201

Graebe Road Stabilization
Infrastructure
Post-Bid
Jeffersonville, IN

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

2021 HMA Resur­face Package 1
Infrastructure
Results
Fort Wayne, IN

Community Cross­ings HMA Resurface 2021
Infrastructure
Results
Fort Wayne, IN

Main Street (FKA Woerner Avenue) Floodwall Gate Replacement
Demolition, New Construction, Infrastructure
Construction
$4,497,000 CJ est. value
Clarksville, IN 47129

Main Street (FKA Woerner Avenue) Floodwall Gate Replacement
Demolition, New Construction, Infrastructure
Construction
$4,497,000 CJ est. value
Clarksville, IN 47129

North Wastewater Treatment Plant - River Ridge Development Authority
New Construction, Infrastructure
Pending Verification
$42,000,000 CJ est. value
Charlestown, IN 47111

DuPont Road Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Fort Wayne, IN 46802

Intersection Improvement, Median U-Turn
Infrastructure
Design
$1,735,199 CJ est. value
Columbus, IN 47201

Last Updated 01/17/2023 11:34 PM
Project Title

Small Structure Replacement

Physical Address View project details and contacts
City, State (County) North Vernon, IN 47265   (Jennings County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,139,256 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0.93 miles S of South SR 7 As of January 18, 2023, the project is in Final Planning status. Anticipated letting date is April 12, 2023. INDOT - Small Structure Replacement *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents