Similar Projects
Duplainville Road, Bridge Over Spring Creek, B-67-0009
Renovation, Infrastructure
Bidding
$500,000 to $749,999 est. value
Pewaukee, WI 53072

2022 Road Improvement Program
Infrastructure
Bidding
$525,000 est. value
Delafield, WI

2021 Street Maintenance
Post-Bid
Oconomowoc, WI

2021 Road Program
Post-Bid
Brookfield, WI 53045

Hillendale Drive Reconstruction
Results
Muskego, WI 53150

2021 Street Projects 47
Results
Less than $2,000,000 est. value
Oconomowoc, WI

Sunset Drive, STH 67 to Moraine View Drive
Infrastructure
Bidding
$2,000,000 to $2,999,999 est. value
Waukesha, WI 53189

2021 Road Improvement Program
Post-Bid
Delafield, WI

IH 43, Rock Freeway, 124th Street and 116th Street Br.; IH 43, Rock Freeway, STH 83 to STH 164; IH 43, Rock Freeway, STH 164 to Beloit Road
Results

Markham Road, Appletree Lane, South Parkview Drive Road Projects
Infrastructure
Bidding
$68,000 est. value
Eagle, WI 53119

Town Hall Drive Reconditioning
Renovation
Post-Bid
Eagle, WI

Lawndale Avenue, Fairmont Avenue and Caldwell Street Utility and Street Improvements
Renovation
Results
Waukesha, WI 53188

Public Works Building and Park Path Paving
Infrastructure
Bidding
$105,000 est. value
Nashotah, WI

Asphalt Concrete Paving - County Highway System
Infrastructure
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Last Updated 05/10/2022 03:57 AM
Project Title

2022 Road Program

Physical Address View project details and contacts
City, State (County) Dousman, WI   (Waukesha County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Seal Coating, Culverts, Waterways, Storm water Channels, Tree Cutting, Crack Sealing Repair and/or Maintenance, Asphalt Overlay, Street/Road Asphalt Resurfacing and Milling, Paving (Highway, Road or Street), Street/Road Asphalt Milling, Sitework/Excavating and Grading, Pavement Resurface and Rehabilitation, Asphalt Pulverizing, Grubbing & Clearing, Erosion Control - Temporary, Paving (Asphalt or Concrete). Description: Project involves 1,850 SY pulverization, 275 ton of 2 1/2 " binder and 160 ton 1 1/2 " surface course of asphalt for Hunters Lake Road. 650 SY Mill and Overlay on Hidden Valley Drive, and 300 SY asphaltic patch and 4,300 SY of Flex Patch and micro surfacing on Gramling Circle. Mandatory Alternate includes 200 SY asphaltic patch and 2,200 SY of Flex Patch and micro surfacing on Pasteur Ct and removal & landscaping of abandoned Town roadway (500 SY).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents