Similar Projects
Partition Wall Maintenance and Repair
Term Contract
Bidding
Fort Worth, TX 76102

Z--763-19-1-328-0011 Logistics & QA Office Finish - Dallas CMOP
Build-Out
Post-Bid
$25,000 to $100,000 est. value
Lancaster, TX 75134

PUF FY16 Repair Loose Guardrail
Post-Bid
$210,000 est. value
San Antonio, TX

Waco Ceiling Finishes
Results
TX

NC Interior Load Bearing Wall Renovations
Results
$40,000 to $50,000 est. value
Galveston, TX

Vandegrift High School Secure Vestibule
Construction
Austin, TX 78750

Gala Staging
Post-Bid
Austin, TX

Exhibit Design, Fabrication, and Installation Services
Results
Austin, TX

Operable Partitions for Pasadena Convention Center
Post-Bid
Pasadena, TX 77507

John Peace Library (JPL) Column Repair and Related Work
Results
$39,500 est. value
San Antonio, TX

Suspended Ceiling Specialist
Post-Bid
Grapeland, TX 75844

Benton Ceiling Repairs and Move In Ready
Results
Waco, TX 76700

Ceiling Tile
Post-Bid
Houston, TX 77002

Starc Portable Modular Wall System
Results
$65,233 est. value
Plano, TX

Fine Arts Building - Water Intrusion Repairs
Post-Bid
Houston, TX

Last Updated 10/22/2019 09:34 AM
Project Title

Insulation Service

Physical Address View project details and contacts
City, State (County) Houston, TX 77073   (Harris County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description It is the intention of the Aldine Independent School District to establish an annual contract for insulation services with one qualified vendor. The awarded contractor must be an experienced vendor and have personnel to service multiple projects and departments concurrently. These Insulation Services will be utilized by the Maintenance Department and other departments on an as needed basis. Contractor services includes all facets of Insulation works and maintenance. However, in an emergency situation, services required by the Maintenance Department will supersede services requested by all other departments. It is Aldines intention to award to a single vendor; however the district retains the right to award to multiple vendors. Contract Term: The contract shall exist for one year, with an option to renew for two additional one year periods if agreed to in writing by Aldine ISD and the awarded vendor. During the previous 2017-2018 school year, the district spent approximately $106,342.06. The previous expenditure is an estimate and is not to be construed to be a guarantee of a maximum or a minimum contract value.
Details
Division 07 - Thermal and Moisture Protection, Thermal Insulation, Blanket Insulation, Foamed-In-Place Insulation, Sprayed Insulation, Exterior Insulation and Finish Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Duct Insulation, HVAC Equipment Insulation, HVAC Piping Insulation.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents