Similar Projects
Last Updated | 05/28/2020 10:28 AM |
Project Title | Oak Hollow Lake Dam Drainage Improvements |
Physical Address | View project details and contacts |
City, State (County) | High Point, NC 27261 (Guilford County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of approximately 250 LF of drain pipe and appurtenances to control seepage and standing water downstream of the Oak Hollow Lake dam. Additional re-grading will be required to provide positive drainage toward existing and proposed inlets. These construction documents include a filter drain system to collect and control this seepage and surface drainage improvements in this area. Work of the Project includes furnishing all labor, materials, tools, and equipment required to install the filter drain system and improve surface water drainage. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |