Similar Projects
White Oak Crossing Mini Storage
New Construction
Conception
North Little Rock, AR 72113

Van Dyke Center
New Construction
Conception
Rogers, AR 72756

Helios Storage
New Construction - 33,465 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Hot Springs, AR 71901

Modern Storage
New Construction - 309,921 SF
Design
$10,000,000 CJ est. value
Springdale, AR 72762

Middle School Gym HVAC Upgrades, Cherokee Elementary Remodel and Food Storage Projects
Renovation, Alteration
Bidding
Fayetteville, AR

Renovation of an Existing Metal Building to House the Malvern Police Department
Renovation
Post-Bid
Malvern, AR 72104

Steel 40x60 4 Bay Shop Building
New Construction
Post-Bid
Winslow, AR

General Contractor for a Maintenance Building
New Construction - 36,000 SF
Results
Bentonville, AR

40 Wide By 100 Long Red Iron Structure With Metal Covering
New Construction
Results
Batesville, AR

Southern Shingle Addition
New Construction, Addition
Construction
Bryant, AR 72022

Wagon Wheel Storage
New Construction - 802,770 SF
Construction
$10,000,000 CJ est. value
Springdale, AR 72762

Tree Climbers Warehouse
New Construction - 11,760 SF
Pending Verification
Fayetteville, AR

Rogers Warehouse Development
New Construction
Pending Verification
Springdale, AR

Modern Storage
New Construction - 117,950 SF
Design
$10,000,000 CJ est. value
Rogers, AR 72758

Rock Region Metro Trolley Barn
New Construction
Post-Bid
North Little Rock, AR 72114

Reported 03/02/2022 12:00 AM
Project Title

Six (6) Steel Building Packages

Physical Address View project details and contacts
City, State (County) Calico Rock, AR   (Izard County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Metal building shall have a 26 – gauge lap seam roof with proper sealant at each lap and long life screws. A 20-year limited warranty is required. Walls shall be 26 gauge metal panels painted with a 20 year warranted paint finish (provide warranty) from manufacturers standard color chart. Walls, trim, and roof colors shall be from manufacturer’s standard color chart. Building shall have a commercial trim package including gutters and downspouts at both eaves.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents