Similar Projects
Flagship Healthcare - Grier Heights
New Construction
Conception
Charlotte, NC 28207

Liberty Senior Living Development
New Construction - 461,000 SF
Conception
$10,000,000 CJ est. value
Wilmington, NC

The Lawson
New Construction - 149,750 SF
Design
$10,000,000 CJ est. value
Knightdale, NC

White Oak NW Medical Office
New Construction - 46,164 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Garner, NC 27587

Aspen Dental
Build-Out - 3,500 SF
Bidding
Lexington, NC 27292

Interior Renovations and Site Improvements for Alamance Dental Health Clinic
Renovation
Bidding
Burlington, NC 27217

Aspen Dental
Build-Out - 3,500 SF
Post-Bid
Wake Forest, NC 27587

Behavioral Health Center
New Construction - 84,200 SF
Post-Bid
$35,000,000 est. value
Asheville, NC 28803

Z--Inpatient Privacy Renovate 5B
Renovation - 8,000 SF
Results
$1,000,000 to $5,000,000 est. value
Durham, NC

1603 And 1593 Monroe Police Station Monroe Senior Center
New Construction, Renovation - 59,596 SF
Results
Monroe, NC 28112

Sharon Road Mixed Use
New Construction, Renovation - 178,500 SF
Construction
$10,000,000 CJ est. value
Charlotte, NC 28211

The Terraces
New Construction, Addition
Construction
Charlotte, NC 28210

Wake Forest Baptist Medical Center Masterplan
New Construction
Pending Verification
Winston-Salem, NC 27157

Wilmington Health
New Construction - 19,882 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Wilmington, NC 28401

Carolinas Rehabilitation
New Construction
Conception
Charlotte, NC 28207

Reported 09/15/2021 11:12 AM
Project Title

Senior Continuing Care Retirement Community

Physical Address View project details and contacts
City, State (County) Cherokee, NC   (Swain County)
Category(s) Medical, Residential
Sub-Category(s) Assisted Living Facility, Medical Office/Outpatient, Nursing/Rehabilitation Center
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected first quarter 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Preliminary plans for the Senior Community include various components including: Independent Living Apartments and Cottages, Assisted Living Apartments, Skilled Nursing Residential Healthcare, Memory Care Center, Adult Day Care, Wellness Center, and a new Dialysis Center.

Details

Assisted Living Facility, Nursing/Rehabilitation Center, Medical Office/Outpatient, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Wall Coverings, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents