Similar Projects
Provide for the Construction of a Bulkhead
Bidding
Port Chester, NY 10573

Parking Lot 15 Drainage Improvements
Term Contract
Post-Bid
Valhalla, NY

Chemka Concrete Deck and Drain Replacement
Post-Bid
Hastings-on-Hudson, NY

ADA Improvements Library Lot and Trench Drain Replacement Library South Lot
Results
New Rochelle, NY

Flood Damage Reduction Project for Saw Mill River Control Wall
Results
$100,000 to $250,000 est. value
Ardsley, NY 10502

Bulkhead/Seawall Construction Administration
Post-Bid
Port Chester, NY

Hudson View Park Culvert Replacement Project
Results
Less than $690,000 est. value
Irvington, NY

Soundview Street Drainage Improvements
Post-Bid
Port Chester, NY

Job Order Contract - Culvert
Results

Trench Drain Grate
Post-Bid
NY

Concrete Retaining Wall at Organic Yard
Results
Yonkers, NY 10701

Woodland Street Water Main and Drainage Improvement
Post-Bid
Mount Kisco, NY 10549

JFK Marina Shoreline Stabilization
Results
Yonkers, NY

West Street Drainage Outlet Remediation
Post-Bid
Harrison, NY 10528

Slope Repair and Stabilization North County Trailway
Results
$250,000 to $300,000 est. value
Yorktown, NY 10598

Last Updated 03/04/2019 04:12 PM
Project Title

Storm Culvert Rehabilitation at Old Saw Mil River Road

Physical Address View project details and contacts
City, State (County) Greenburgh, NY 10607   (Westchester County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project consists of the removal and replacement, and/or reliving of an existing stream culvert as shown on the Contract Documents and shall include all sheeting, excavation, stockpiling, removal and disposal of soils, removal and disposal of pipe, temporary storm water bypassing and additional activities
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents