Similar Projects
Culvert Replacement - CUY-SR 82-09.66 Replace
Infrastructure
Bidding
OH

Stabilize Cuyahoga Riverbank
Alteration
Bidding
$10,000,000 est. value
Akron, Cleveland, Independence, OH 44131

Jacking and Boring Services
Post-Bid

Ramp Area Water Infiltration Repairs
Post-Bid
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44199

Lindbergh Boulevard (C.R. 276) Replacement of Existing Culvert C-00.93 Over a Creek to the West Branch
Results
Less than $600,000 est. value
Cleveland, OH 44115

Cleveland East Breakwater West Extension Repair
Results
Cleveland, OH 44102

Stream Bank Stabilization Along Blodgett Creek at Brigadoon Way in Strongsville
Infrastructure
Bidding
$390,000 est. value
Cleveland, OH

Culvert Cleanout Services
Infrastructure
Post-Bid
Akron, Ashland, Bowling Green, Chillicothe, Delaware, Garfield Heights, Jacksontown, Lebanon, Lima, Marietta, New Philadelphia, Sidney, OH

Slide Repair - IR 480-20.12 EB Slide
Results
OH

Doan Brook Restoration Near Horseshoe Lake Park
Infrastructure
Post-Bid
Cleveland, OH

Culvert Replacement - MNT FY2020 Drainage
Results
Euclid, Garfield Heights, OH 44117

2021 Village Complex Stream Erosion Control
Infrastructure
Post-Bid
$53,300 est. value
Moreland Hills, OH

South Woodland Road Culvert Replacement Project
Results
$251,416 est. value
Shaker Heights, OH 44120

Jacking and Boring Services
Infrastructure
Post-Bid

Construction Manager at Risk for Cleveland Metroparks Heritage 1 Boat Slips, Canal Basin Park, Ohio and Erie Canal Reservation and Rivergate Park Boat Slips, Merwin's Wharf, Ohio and Erie Canal Reservation
Results
$197,690 est. value
Cleveland, OH 44113

Last Updated 12/22/2021 09:59 AM
Project Title

Big Creek Flood Reduction Near Sprague Road

Physical Address View project details and contacts
City, State (County) Cleveland, OH   (Cuyahoga County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $937,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: *420 LF of stream restoration *Culvert replacement under West Sprague Road *Floodplain expansion *Refer to the Contract Documents and Specification Section 01 11 00 Summary of Work for additional information.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents