Similar Projects
Provide RMHU Sewage Pump Station at Marcy CF
Renovation
Bidding
$50,000 to $2,000,000 est. value
Marcy, NY 13403

Variable Speed Pump Station Replacement
Renovation
Bidding
Warwick, NY 10990

Cumberland Avenue Pump Station CSO Upgrades
Post-Bid
Plattsburgh, NY 12901

Wastewater Pump Station Improvements
Post-Bid
Poughkeepsie, NY 12602

CM Services - Riverfront Pump Station
Term Contract
Results
Albany, NY 12242

Tarbell Hill Pump Station Improvements
Term Contract
Results
Port Henry, NY 12974

WPCP Low Lift Pump Improvements
Post-Bid
Poughkeepsie, NY 12601

Fourth Street Sewage Pump Station Improvements
Results
Buchanan, NY 10511

One (1) Wastewater Influent Comminutor at River Terrace Pump Station
Post-Bid
Endicott, NY 13760

Water Chemical System Improvements
Results
Less than $1,500,000 est. value
Buffalo, NY

Snowmaking Prefabricated Pump Station
Post-Bid
NY

Sanitary Pump Station Replacement -Evangola State Park
Results
Less than $200,000 est. value
Irving, NY 14081

Stardust Pump Station
Post-Bid
Olean, NY 14760

GC Phase 2 Water Supply, Contract 3: New Water Pump Stations
Term Contract
Results
Batavia, NY 14020

Emerson Park Sewer Station Repair
Post-Bid
Auburn, NY 13021

Reported 08/08/2020 12:00 AM
Project Title

Installation of Piping and a Booster Pump Station

Physical Address View project details and contacts
City, State (County) Clifton Park, NY 12065   (Saratoga County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project is generally described as the installation of piping and a booster pump station to complete an interconnection between the Clifton Park Water Authority distribution system and the Saratoga County Water Authority transmission main. The work includes all labor, materials, and equipment for the installation of a new packaged booster pump station and the construction of necessary piping, site work, and electrical and controls work to complete the interconnection. Work also includes all other ancillary and restoration work required for a complete and operational installation.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents