Similar Projects
2022 Bond - Proposition B - McDade Independent School District
Addition, Demolition, Renovation, Infrastructure
Conception
$23,000,000 CJ est. value
McDade, TX 78650

Elgin Campus - 2022 Bond - Austin Community College
New Construction, Infrastructure
Conception
$25,000,000 CJ est. value
Elgin, TX 78621

Yerico Manufacturing Warehouse
New Construction, Infrastructure - 30,000 SF
Design
$2,500,000 CJ est. value
Elgin, TX 78621

Yerico Manufacturing - Manufacturing Space & Accessory Office
New Construction, Infrastructure - 20,064 SF
Design
$4,000,000 CJ est. value
Elgin, TX 78621

Pistol Hill Booster Station Improvements
Infrastructure, Renovation
Bidding
$4,000,000 CJ est. value
Elgin, TX 78621

Pistol Hill Booster Station Improvements
Infrastructure, Renovation
Bidding
$4,000,000 CJ est. value
Elgin, TX 78621

Simsboro Aquifer Water Treatment Plant Bid Package No. 4
Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Bastrop, TX 78602

Simsboro Aquifer Water Treatment Plant Bid Package No. 4
Infrastructure
Sub-Bidding
$3,000,000 CJ est. value
Bastrop, TX 78602

East Construction of Sitework, Fencing, Planting and Irrigation
Alteration
Post-Bid
Bastrop, TX

Emulsified Asphalt
Term Contract
Post-Bid
TX

Harvest Ridge Sections Two and Three Streets, Drainage, Water and Wastewater Improvements
Infrastructure
Results
Elgin, TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Project Echo - SpaceX Facility / Texas
New Construction, Infrastructure - 521,521 SF
Construction
$43,000,000 CJ est. value
Bastrop, TX 78602

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Last Updated 03/08/2023 08:31 PM
Project Title

Simsboro Aquifer Water Supply Facilities - Bid Package 8

Physical Address View project details and contacts
City, State (County) Bastrop, TX 78602   (Bastrop County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Package 8 - Well Site Access and Sitework The City of Bastrop is in the process of converting its water supply source from shallow alluvial wells primarily fed by the Colorado River to deep wells that draw from the Simsboro Aquifer; which will provide the City with a reliable, resilient, drinking water supply. THIS PACKAGE SPECIFICALLY includes the scope of work to complete access paving at the well sites, permanent gates and fencing, and associated sitework at the well sites. The general project consists of the following: A new well field and production facilities Three additional wells are needed to meet Phase 1 flows, which consist of an average production capacity of 3 MGD and a peak capacity of 6 MGD. Water collection piping and access roads will be installed to each of the new wells. Groundwater treatment facilities Based on water quality sampling, a WTP primarily focusing on iron and manganese removal is needed. It will consist of chemical addition facilities housed in a chemical building and gravity filters housed in a filter building. Low Lift pump station Once treated, water will be pumped from the filter effluent to a 0.5 MG clearwell through the Low Lift pump station Ground Storage Tank (clearwell) 5 MG clearwell, Backwash pump station Backwash pumps will pull water from the clearwell and send it through the treatment plant to clean the filters Transmission piping - water will be conveyed through the 24-inch diameter, 21,500 lf transmission pipeline to GSTs at the Willow Site. Lift Station and Force Main A 21,500 lf wastewater forcemain will run along the same route as the transmission pipeline to convey wastewater generated during filter backwash and in the Filter Building to the Citys wastewater collection system. Associated services Electrical and instrumentation Site development and access Various site improvements, paving, grading, fencing, landscaping. The deadline to ask questions is 3/02/2023 3:00 PM CST

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents