Similar Projects
Wastewater Pump Station Improvements
Design
North Bay Village, FL

Sanitary Pump Station Journey`s End Upgrade and New Force Main Project
Renovation
Bidding
$933,000 est. value
Coral Gables, FL 33156

Wastewater Pump Station Improvements
Renovation
Bidding
North Bay Village, FL 33141

Weekly Septic Cleanout
Post-Bid
Homestead, FL 33030

Septic Services
Term Contract
Post-Bid
Miami, FL

60-Inch Force Main (NL-1A) between the Intersections of NE 151 Street and Biscayne Boulevard and NE 163 Street and NE 8 Avenue
Results
Less than $23,960,532 est. value
North Miami Beach, FL 33162

2020 General Utility Repairs
Results
Medley, FL 33166

PS 9 - Cravero Pump Station Force Main Replacement
Infrastructure
Bidding
$350,000 est. value
North Miami Beach, FL 33162

Trenchless Pipe Installation and Pipe Rehabilitation Services
Post-Bid
FL

60-Inch Force Main (NL-1A) (West Segment) along Northwest 162 Street from Northwest 6 Avenue to Northwest 8 Avenue
Results
Less than $21,954,755 est. value
Miami, FL 33169

Master Pump Station 4 Force Main Re-Routing (SEWR2002)
Renovation, Infrastructure
Bidding
$1,479,000 est. value
Miami Gardens, FL 33056

West Palm Drive Pump Station and Force Main
New Construction
Post-Bid
Florida City, FL 33034

Comprehensive Everglades Restoration Plan; Biscayne Bay Coastal Wetlands; L-31E Flow-Way; Contract 5A (A Phase I Project): Pump Stations S-703 And S-705; Recreational Sites; Miami-Dade County, Florida
Results
$5,000,000 to $10,000,000 est. value
Miami, FL

NW 90th Street Stormwater Lift Station No. 2 and Retention Area
Renovation, Infrastructure
Bidding
Medley, FL 33166

Rehabilitation of Sanitary Sewers
Infrastructure
Post-Bid
$852,727 est. value
Miami, FL

Last Updated 01/26/2022 11:33 AM
Project Title

Sanitary Pump Station D Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Miami, FL 33143   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of, but is not necessarily limited to the following: the selling, delivering and installing of Contractor furnished materials, structures and equipment for the upgrade of Pump Station D; installation of 8-inch PVC force main including cleaning and testing as required; installation of new watertight hatches for the new wet well and new valve vault structures; installation of new submersible control panel complete with associated instrumentation; installation of landscaping, sodding and irrigation system; demolition of existing pump station building and associated equipment; restoration of area to pre-construction conditions or better; together with all appurtenant for miscellaneous items and work for a completed project per the Plans and Specifications for this project.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 05 - Metals.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents