Similar Projects
New Elementary School
New Construction
Conception
Columbia, MO 65203

New Elementary School
New Construction
Conception
Columbia, MO

Multiple Construction Projects
Renovation
Design
$300,000 est. value
Oak Hill, MO

Engineering Works
Renovation
Design
Clarkton, MO

Alterations To: Monroe Elementary School - Phase II
Renovation
Bidding
$2,500,000 CJ est. value
Saint Charles, MO 63301

Pheasant Point Elementary School Storm Shelter Addition
Addition, Demolition, Infrastructure - 16,712 SF
Bidding
$2,600,000 CJ est. value
O Fallon, MO 63368

Harrisburg R-VIII Elementary & Middle School Renovations
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Harrisburg, MO 65256

Fulton 58 School District-Secure Vestibule Upgrades
Renovation
Post-Bid
Fulton, MO 65251

Woodland Elementary School Phase II
Renovation
Post-Bid
Kansas City, MO 64106

North Glendale Elementary, Secured Vestibule Renovation Project 2021
Renovation
Results
Kirkwood, Saint Louis, MO 63122

McGrath Elementary School And ECC: Building Package (Phase 1)
New Construction
Results
Brentwood, MO 63144

Ladue Old Bonhomme Elementary
Renovation
Construction
Saint Louis, MO 63132

Briarcliff Elementary
Renovation, Addition - 10,300 SF
Construction
Kansas City, MO 64116

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Holy Cross - Bright Futures Academy
Addition, Demolition, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Kansas City, MO 64123

Last Updated 11/18/2022 11:15 AM
Project Title

Neosho School District STEAM Academy

Physical Address View project details and contacts
City, State (County) Neosho, MO 64850   (Newton County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Construction Manager - 10/12/22
Owner View project details and contacts
Architect View project details and contacts
Description

scope: Renovation of 32,000 +/- Sq. Ft. historic 4-story building into new school facilities 1. Project consist of the complete renovation of the historic HAAS warehouse building. The building consists of an Annex, that is being renovated into administration space and a commons area. As well as a 4-story warehouse, that is being renovated into a makers space and classrooms for grades kindergarten through fourth grade. Plans call for the conversion of the Haas Building into a STEAM elementary school for 250 to 300 students.

Details

28,005 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents