Similar Projects
Bloomer - New Auburn, 83rd Street to CTH Q
New Construction, Infrastructure
Bidding
WI

City Wide Street Chip Sealing
Infrastructure
Bidding
Eau Claire, WI

2021 LRIP Road Improvements
Post-Bid
New Auburn, WI 54757

Lift to Road
Infrastructure
Post-Bid
Bloomer, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

City Wide Street Micro Surfacing
Infrastructure
Bidding
Eau Claire, WI

Culvert Installation
Infrastructure
Post-Bid
WI 54724

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Twin Valley Road Improvements
Infrastructure
Bidding

Road Work
Infrastructure
Post-Bid
Bloomer, WI 54724

Anson 105th Avenue Resurfacing
Results
Jim Falls, WI

Crack Sealing
Infrastructure
Post-Bid
Bloomer, WI 54724

C. Chippewa Falls, Seymour Cray SR Blvd., CTH I Intersection
Results
Chippewa Falls, Seymour, WI

Transit Transfer Center Bid Package No. 3
Renovation, Infrastructure
Post-Bid
Eau Claire, WI

Last Updated 03/08/2022 03:54 PM
Project Title

Hope Village Community Center

Physical Address View project details and contacts
City, State (County) WI   (Chippewa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of an access drive with approximately 400 feet of 6-inch watermain and 8-inch sanitary sewer. The project also includes an access drive, sidewalks, and concrete pads for tiny homes.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents