Similar Projects
Sludge Dewatering and Drying Facilities
New Construction
Bidding
Concord, Griffin, GA 30223

Sludge Dewatering and Drying Facilities
New Construction
Bidding
Concord, Griffin, GA 30223

FY 2019 Southeast WWTP Improvements Phase II
Post-Bid
Douglas, GA 31533

Baconton Wastewater Treatment Plant Improvements
Post-Bid
Less than $175,000 est. value
Baconton, GA 31716

UV Disinfection System Replacement
Results
Less than $164,927 est. value
Statesboro, GA 30458

North WPCP Improvements
Results
Hawkinsville, GA

Middle Oconee WRF Maintenance Building
New Construction
Construction
Less than $1,345,000 est. value
Athens, GA 30606

Biosolids System Improvements - Digester Covers
Post-Bid
Augusta, GA 30901

James Creek Building Repairs
Results
Less than $63,030 est. value
Suwanee, GA 30024

Mill Creek Water Pollution Control Plant
Post-Bid
Chatsworth, GA 30705

Bar Screen and Grit Removal Equipment Replacement
Results
Fitzgerald, GA

Bioxide Odor and Corrosion Control
Term Contract
Post-Bid
Savannah, GA 31400

Operation and Maintenance Services for Wastewater Facilities and Pump Stations in the North Fulton Service Area
Results
Atlanta, GA

Membrane Replacement on Anaerobic Digester Covers Water Pollution Control Plant
Post-Bid
Milledgeville, GA

Rubes Creek Water Reclamation Facility Dewatering Building Modifications Project
Renovation
Results
Woodstock, GA

Reported 09/25/2020 12:00 AM
Project Title

Steel Fabricated Wastewater Treatment System

Physical Address View project details and contacts
City, State (County) Alexandria, AL 36250   (Calhoun County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes furnishing and installing a new steel fabricated wastewater treatment system, demolition of the existing treatment unit and interconnection with the existing lift station and effluent sand filters to provide a fully functional wastewater treatment system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents