Similar Projects
New Energy Star Certified Manufactured and/or Modular Homes
Results
Less than $2,800,000 est. value
FL

Mobile Home/Modular Home
Results
Port Saint Joe, FL 32456

Manufactured Home Proposals
Post-Bid
FL

Manufactured/Mobile Home Manufacturers for CDBG-DR Program
Results
Tallahassee, FL

Florida Community Land Trust Workforce Housing
New Construction
Design
$13,000,000 est. value
Big Pine Key, FL 33043

Replacement of 8 or more Owner-Occupied Mobile Homes with New Manufactured Homes, Wind Zone 3
Results
Carrabelle, FL 32322

Savannah Ridge
New Construction - 3,062 SF
Conception
$500,000 to $1,000,000 CJ est. value
Fort Pierce, FL 34982

Manufactured Home - Bid Package #4
Post-Bid
Apalachicola, FL

Mobile Home Bid 3
- 600 SF
Post-Bid
FL

Simple Life Ventures Tiny Home Park
New Construction
Design
Punta Gorda, FL 33955

Reported 11/12/2019 03:39 PM
Project Title

Manufactured Home for Camp Crystal Lake

Physical Address View project details and contacts
City, State (County) FL   (Alachua County)
Category(s) Residential
Sub-Category(s) Manufactured Homes
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this IFB is to establish a firm fixed-price contract with a qualified company to provide turnkey installation of a manufactured home (hereinafter “Home”). Services include, but are not limited to, the following: a. Furnish one (1) new manufactured home that meets or exceeds the minimum requirements set forth in Attachment E. b. Deliver new manufactured home to Camp Crystal Lake, Florida. c. Install new manufactured home, including set-up, skirting, utilities (A/C, electrical, plumbing, and septic), and three set of 4x4 steps (one for each exterior door). d. Oversite and supervision of all delivery and installation subcontractors. e. Manufacturing, delivery, and installation services shall comply with all local, state, and federal codes, rules, regulations, and statutes, including all applicable building codes.

Details

Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Wood Framing, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation.
Division 08 - Openings, Wood Doors, Plastic Doors, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Carpeting, Painting.
Division 11 - Equipment, Residential Equipment.
Division 13 - Special Construction, Fabricated Engineered Structures, Fabricated Structures.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents