Similar Projects
Shady Oaks Pump Station Improvements
Renovation
Bidding
Millington, TN 38053

Shaw Filter Valve Replacement
Renovation
Bidding
Cordova, TN 38018

Reclaim Water Meters
New Construction
Post-Bid
Murfreesboro, TN 37130

Sewer System Improvements Express Mart Pump Station Replacement
Post-Bid
TN 37847

North West Utility District Water Treatment Facility Improvements
Results
Less than $7,200,000 est. value
Soddy-Daisy, TN 37379

Sodium Hypochlorite Disinfection System for Water Treatment Plant
Results
Chattanooga, TN 37400

Hiwassee Utilities Commission-Drainage Piping Repairs
Renovation
Bidding
Charleston, TN 37310

Rehabilitation of the Treatment Filters at the Water Treatment Plant
Post-Bid
Springfield, TN

Sewer System Improvements - Sewage Pumping Station Replacement at WWTP
Results
Pulaski, TN

Water Treatment Plant Filter No. 1 Rehabilitation
New Construction
Post-Bid
Spring City, TN

Screens for Headworks at Wastewater Treatment Plant
Term Contract
Results
Spring Hill, TN 37174

SCADA System Upgrades
Post-Bid
Spring Hill, Thompson's Station, TN 37174

2018-19 Lift Station Phase-Out
Renovation
Results
Johnson City, TN

Contract 121- Hayshed Road and Luke Lane Sewer Improvements
Post-Bid
Charlotte, TN 37036

2020 ARC Project for Clayton Homes Pump Station and Force Main Conveyance
New Construction
Results
Rutledge, TN

Last Updated 03/31/2022 04:38 PM
Project Title

WTP and Blue Ribbon Parkway Booster Station Improvements

Physical Address View project details and contacts
City, State (County) Shelbyville, TN   (Bedford County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New Traveling Water Screen and Controls at Raw Water Intake • Settling Basin Nos. 1 and 2 Renovation including over/under baffles and tube settlers • Pipe Gallery and Filter Improvements including new Filter No. 6 • New Horizontal Split Case High Service Pump • Miscellaneous HVAC and Roofing Improvements • New Control and Monitoring System • Renovation of the Blue Ribbon Parkway Water Booster Station and all other appurtenances shown on the Plans

Details

Lift and Pump Stations, Renovation, Water Treatment Plant, Renovation.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents