Similar Projects
Palm Beach Shores Water Main Improvement Project
Bidding
Riviera Beach, FL 33404

Unit 53 Arden - Parcels J, G-South and I-South Public Improvement Project
Bidding
North Palm Beach, FL

Utility Metering
Term Contract
Post-Bid
Orlando, FL 32816

Pipeline Wet Tapping and Line Stop Continuing Construction Contract
Term Contract
Post-Bid
$5,500,000 est. value
West Palm Beach, FL 33416

46--Water Purification System
Results
Palm Beach Gardens, FL 33410

F--Water Chlorine, Bldg Monitoring
Results
Orlando, FL 32827

Construction of a Potable/Drinking Water Main and Sewer Force Main
Bidding
Apopka, FL 32712

Pipeline Cleaning Services
Term Contract
Post-Bid
West Palm Beach, FL 33415

N--Domestic Water Isolation (Shutter) Valves (Va-19-00034342)
Results
Palm Beach Gardens, FL 334106400

Raw Watermain Improvements for Surficial Aquifer (SA) Wells 8A-12A and Site Demolition for SA Wells 6-12 (W1817B)
Bidding
Jupiter, FL 33458

Aerial (Pipe) Crossing, Maintenance Services
Term Contract
Post-Bid
Palm Beach, FL

Water Main Improvements: 31st, 32nd, 33rd, 34th and 35th Streets
Results
West Palm Beach, FL

Reclaimed Watermain for Area 10
Post-Bid
Delray Beach, FL

1 Million and 3 Million Storage Tanks Pressure Sustaining Valve Replacement
Results
Less than $135,000 est. value
Boynton Beach, FL 33425

Pre-Qualification of Vendors Ductile Iron-Pipe and Fittings
Term Contract
Post-Bid
West Palm Beach, FL

Last Updated 03/26/2021 07:03 AM
Project Title

Water Main Improvements on Military Trail, Central Boulevard, and at the Water Treatment Facility

Physical Address View project details and contacts
City, State (County) Lake Worth, Orlando, FL 33463 (Orange, Palm Beach Counties)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements at three locations within the Town of Jupiter: the Military Trail Loop is located along Military Trail between the Wood Duck Community and the Barcelona commercial property; the Country Corner Water Service is located along Central Boulevard just south of Indiantown Road; and the 6-Inch water main is at the Jupiter Water Treatment Facility. The construction of +/- 150 linear feet of 8-inch and 10- inch water main piping under Military Trail from the east side by the Wood Duck development to the west side by the Barcelona commercial property. The crossing below this Palm Beach County arterial roadway will be accomplished via horizontal directional drilling +/- 115 linear feet of 10-inch ductile iron pipe size HDPE pipe with the remainder of the water main pipe being installed via open-trench on each side of the roadway which includes the installation of +/- 35 linear feet of 8-inch ductile iron pipe. The construction of +/- 145 linear feet of 2- inch polyethylene water service tubing inside +/- 135 linear feet of 3-inch High Density Polyethylene (HDPE) water service sleeve piping under Central Boulevard from the east side by the northwest property corner of the Town of Jupiter Water Treatment Facility to the west side by the Country Corner commercial property.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents