Similar Projects
Maco Addition
Addition, Infrastructure - 7,800 SF
Conception
$4,200,000 CJ est. value
Shelby, NC 28150

Maco Addition
Addition, Infrastructure - 7,800 SF
Conception
$4,200,000 CJ est. value
Shelby, NC 28150

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Intersection Realignment
Infrastructure
Design
$1,000,000 CJ est. value
Shelby, NC 28150

Cleveland County Water - Contract 5.0 - Casar-Lawndale, Sand Hill, and Will Dixon Road Water Lines
Infrastructure
Bidding
$7,750,000 CJ est. value
Lawndale, NC 28090

Long-arm Mowing on Various Routes in Division 12
Infrastructure
Bidding
Shelby, NC 28150

Asphalt Pavement Repair In Cleveland & Gaston Cos.
Term Contract, Infrastructure
Post-Bid
Less than $5,000,000 est. value

Construction Services for Project South
New Construction, Infrastructure
Post-Bid
$300,000 CJ est. value
Kings Mountain, NC 28086

Water System Extension to Serve Paul Beam Road Area Near Cherryville
Infrastructure
Results
$997,018 CJ est. value
Cherryville, NC 28021

Construction of a Roundabout
Infrastructure
Results
$2,000,000 est. value
Shelby, NC 28152

Cumberland Drive Stormwater Replacements
Infrastructure
Construction
$18,458 CJ est. value
Shelby, NC 28150

Patterson Homes
New Construction, Infrastructure
Pending Verification
$47,400,000 CJ est. value
Kings Mountain, NC 28086

Overlook and Trail Improvements at Crowders Mountain State Park - The North Carolina Parks and Recreation Authority
Infrastructure
Conception
$1,750,000 CJ est. value
Kings Mountain, NC 28086

Cannon 35
New Construction, Infrastructure
Design
$275,000,000 CJ est. value
Kings Mountain, NC 28086

Cleveland Country Club New Pool and Pool House / Shelby
New Construction, Infrastructure - 3,918 SF
Post-Bid
$1,000,000 CJ est. value
Shelby, NC 28150

Last Updated 09/05/2023 04:05 PM
Project Title

Cannon 35

Physical Address View project details and contacts
City, State (County) Kings Mountain, NC 28086   (Cleveland County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Assisted Living Facility, Multi-Family Homes, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $275,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope consists of the phased new construction of up to 730 units including apartments, townhomes and 155 senior living units. Scope details have not been released. As of September 5, 2023, this project is in the late stages permitting and engineering. The approvals process is about 95% complete. An architect has been chosen for a portion of the project. Their information, as well as information regarding the general contractor and method of selection, has not been disclosed. A construction timeline has not been determined.

Details

1 Story Above Grade, New Construction, New Construction. 2 Stories Above Grade, New Construction, New Construction. 1 Story Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents