Similar Projects
OR99/OR99W/OR99E Curb Ramps Project
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
Roseburg, OR 97471

West Hayes Street Improvements
Infrastructure
Bidding
Woodburn, OR 97071

2022-23 Street Resurfacing - Van Buren Avenue and Washington Avenue
Infrastructure
Bidding
$2,170,000 est. value
Corvallis, OR 97333

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

Clinton Avenue Parking Lot at Peterson Elementary School
Infrastructure
Post-Bid
Klamath Falls, OR 97603

2021 Sidewalk Safety Program
Infrastructure
Results
$146,720 est. value
Corvallis, OR 97333

US101: Bunker Hill Sidewalks and Flanagan Signal Project on the Oregon Coast Highway
Infrastructure
Results
OR

ADA Ramp Improvement Project
Infrastructure
Bidding
$140,000 est. value
Cave Junction, OR

Susan Campbell Sidewalk Improvement Project
Infrastructure
Post-Bid
Eugene, OR 97403

NW 174th Ave Sidewalk Infill - NW Santiam Dr to NW Sandpines Ln
Alteration
Results
$100,000 to $200,000 est. value
OR

2022 Paving Improvements at Hwy 155 (Ferry Street) Sidewalk Improvements, 9th Street to Flower Lane
Infrastructure
Bidding
$300,000 est. value
Dayton, OR 97114

Central Oregon Curb Ramps Phase 1
Infrastructure
Post-Bid
$1,000,000 to $2,000,000 est. value

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
OR

Gibson Hill Sidewalk Infill & Pavement Restoration Project
Term Contract
Bidding
OR

OR82 Curb Ramps (Wallowa/Lostine) Project
Infrastructure
Post-Bid
$2,000,000 to $5,000,000 est. value
OR

Last Updated 04/22/2022 02:36 AM
Project Title

Pedestrian Ramp Improvements La Pine Maintenance Zone

Physical Address View project details and contacts
City, State (County) Bend, OR   (Deschutes County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000 to $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work will consists of, but not be limited to, the following Install and maintain temporary traffic control. Remove existing pedestrian ramps, walks, signs, fences and pavement surfacing. Construct new ADA-compliant pedestrian ramps, sidewalk facilities and pavement surfacing. Install new signs and relocate fencing

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents