Similar Projects
Construction of the Andrew Jackson Circle Improvements
Infrastructure
Bidding
$400,000 est. value
Florence, MS 39073

Mill and Overlay of SR 468
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
Pearl, MS 39288

Highway 80 Eastgate and Highway 80 Municipal Drive Signal and Intersection Improvements
Alteration
Post-Bid
Brandon, MS 39042

Annual Asphalt
Term Contract
Post-Bid
MS

Andrew Chapel Road Reconstruction
Results
$3,700,000 est. value
MS 22554

Mill and Overlay Approximately 1 Mile on SR 18 from US 80 to the Terrapin Skin Creek Bridge
New Construction, Infrastructure
Results
MS

Intersection Improvements on Various Routes
Infrastructure
Bidding
$5,000,000 est. value
Puckett, MS

Asphalt Leveling and Patching
Term Contract
Post-Bid
MS

2021 Roadway Sealing
Infrastructure
Results
Richland, MS

Road Repair
Alteration
Post-Bid
Jackson, Pearl, MS 39208

Hot Mix Asphalt Overlay
Infrastructure
Results
$1,569,975 est. value
Pearl, MS

Asphalt Paving, Asphalt Materials and Related Items
Infrastructure
Post-Bid
Brandon, MS

Mill and Overlay Approximately 10 Miles on SR 25 from SR 471 to SR 43 and Approximately 1 mile on Sandhill Road
Infrastructure
Results
MS

Pearl-Richland Intermodal Connector
Infrastructure
Results
$37,752 est. value
Pearl, MS 39288

Placement of Stripe and Raised Pavement Markers
Infrastructure
Results

Reported 05/21/2022 12:00 AM
Project Title

Spillway Road Overlay State Aid Project

Physical Address View project details and contacts
City, State (County) Brandon, MS   (Rankin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Brandon, Mississippi. Completed plans call for site work for a road / highway; and for paving for a road / highway. A pre-bid meeting will be held in the Commission Room on the 1st Floor of the MDOT Administration Building in Jackson, at 2:00 P.M. on the day preceding the date of the bid opening 201902746 The work shal consist essentially of the following iteams, overlaying Spillway Road from the intersection of grants ferry road and spillway road to intersection of HWY 471 and spillway road. Bid bond 5% Performance and payment bond 100% The attention of bidders to provisions of subsections irregular proposals and reject ion bids.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents