Similar Projects
Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

6 Miles of Milling, Resurfacing, and ADA Improvements on US 45 from North Street in Buckley to Jefferson Street in Loda. 1 Foot Saftey Shoulders will be Added to the Rural Section Between Buckley and Loda.
Results
IL

Roadway Widening
Infrastructure
Post-Bid
Sheldon, IL

3.85 miles of shoulder widening and rumble strip installation on IL 1 from 150 feet west of W Circle Dr in St Anne in Kankakee County to E 3100N Rd
Results

Road Repair
Infrastructure
Post-Bid
Watseka, IL

District 3, Buckley Maintenance Facility
Results
IL

HMA Milling and Resurfacing, Shoulder Work, ADA Ramps, Pavement Marking, and Raised Reflective Markers
Infrastructure
Post-Bid
IL

Overlaying a 21` Wide Roadway, Including HMA Surface Course and All Other Work
Results
Clifton, IL

7.71 Miles, Milling and Resurfacing (Designed Overlay) and ADA Work Begins 0.15 Miles South of South St in Donovan and Ends at US 24 in Sheldon
Infrastructure
Post-Bid
IL

3P Milling and Resurfacing (Designed Overlay) Extending 6.41 Miles from the Ford Co Line to 0.2 Mi E of I-57 in Gilman
Infrastructure
Results
IL

Route 317 (US 24) Beginning at the Intersection of US 45/24(L.M. 0.00) in Gilman and Ending at the Intersection of US 24 and IL 1 (L.M. 12.34)
Infrastructure
Post-Bid
IL

Resurfacing CH 4 from the Ford County line to 500 E Road
Infrastructure
Results
IL

Route 57 (I-57) Beginning at the Ford County Line and Ending Approximately 4.5 Miles North of US 24 (Gilman)
Infrastructure
Post-Bid
IL

Reported 04/30/2022 12:00 AM
Project Title

Intersection of IL 49 and IL 24 (l.m. 0.00) and Ending at the Vermilion County Line (L.M. 21.50)

Physical Address View project details and contacts
City, State (County) IL   (Iroquois County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This work is located on FAP Route 840 (IL 49) beginning at the intersection of IL 49 and IL 24 (L.M. 0.00) and ending at the Vermilion County Line (L.M. 21.50) This work consists of Class B pavement patching and related construction work. 44201031 Sq Yd Class b Patches, Type Ii, 15 Inch Base Items 420.000 44201299 Each Dowel Bars 1 1/2" Base Items 1,012.000 44213200 Foot Saw Cuts Base Items 2,354.000 67100100 l Sum Mobilization Base Items 1.000 70100600 l Sum Traffic Control And Protection, Standard 701336 Base Items 1.000 70102620 l Sum Traffic Control And Protection, Standard 701501 Base Items 1.000 z0030850 Sq Ft Temporary Information Signing Base Items 42.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents