Similar Projects
Shaver Road Bridge and Floodwall, Phase 3
Conception
$2,500,000 est. value
Cedar Rapids, IA

Edgewood Road Trail Phase 2B - Bridge Modifications and Trail
Conception
$4,060,000 est. value
Cedar Rapids, IA 52407

Bridge Deck Overlay
New Construction, Infrastructure
Bidding
IA

Bridge Replacement - PPCB
New Construction, Infrastructure
Bidding
IA

Camp Dodge Training Area Bridge Replacement
Renovation
Post-Bid
Johnston, IA

Dickinson County Templar Park - Highway 9 Access - Hinshaw Bridge Access Courtesy Docks
New Construction, Infrastructure
Post-Bid
$180,000 est. value
IA

West Des Moines Digital Enterprise Segment 5-3 Raccoon River Crossing
New Construction
Results
West Des Moines, IA

J Street SW Bridge Over Prairie Creek Repairs
New Construction
Results
$25,000 est. value
Cedar Rapids, IA 52404

Shaver Road Bridge and Floodwall, Phase 4
Conception
$1,500,000 est. value
Cedar Rapids, IA 52402

Grand Avenue Bridge Over Johnson Creek
New Construction, Infrastructure
Bidding
$2,820,000 est. value
West Des Moines, IA 50266

Bridge Replacement with Twin RCB - BR 1270
New Construction
Results
Less than $375,000 est. value
Polk City, IA

Bridge Deck Overlay
New Construction, Infrastructure
Bidding
IA

2021 Bridge Repair
Renovation, Infrastructure
Results
Webster City, IA 50595

Booneville Road Bridge Over Johnson Creek
New Construction
Results
$1,461,000 est. value
West Des Moines, IA 50266

Bridge Repair
New Construction, Infrastructure
Results
IA

Last Updated 11/17/2021 03:19 AM
Project Title

Bridge Replacement - PPCB

Physical Address View project details and contacts
City, State (County) IA   (Polk County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Route: Trail In Polk County, Trail Bridge Over Beaver Creek 6.00 Each Beams, Pretens. Prestr. Conc. 1.00 Lump Sum Construction Survey 1,277.10 Square Yard Engineering Fabric 1,242.80 Cubic Yard Excavation Class 10 496.00 Cubic Yard Excavation Class 20 705.00 Cubic Yard Excavation Class 21 2,100.00 Linear Foot Pile, Steel h, 10 In. 685.50 Linear Foot Rail, Concrete Barrier 676.00 Linear Foot Rail, Metal 121.90 Square Yard Recreational Trail, Pcc 39,691.00 Pound Reinforcing Steel 58,697.00 Pound Reinforcing Steel, Epoxy Coated 1,324.40 Ton Revetment 498.00 Cubic Yard Structural Concrete 4,009.00 Pound Structural Steel 0001 Trail Bridge Items For a 319'-8 x 12'-0 Pretensioned Prestressed Concrete Beam Bridge

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents