Similar Projects
Shoreline Storage Tunnel Project
Bidding
$213,500,000 est. value
Cleveland, OH

Zoar Levee System Repairs, Zoar, OH
Post-Bid
Zoar, OH

Lower Olentangy Tunnel
Post-Bid
Columbus, OH 43215

Western Campus Tunnel Removal and Presser Hall Bridge Rehabilitation
Results
Less than $1,435,000 est. value
Oxford, OH

Lockington Dam Right Wall Drain System and Concrete Repair Project
Results
Less than $2,614,347 est. value
Lockington, OH 45356

Cleveland Bulk Terminal Ore Conveyance Tunnel Extension Project - Phase B
Post-Bid
Cleveland, OH

Muskingum River Lock and Dam No. 7 Mcconnelsville Dam Replacement Design/Build
Results
Less than $7,300,000 est. value
McConnelsville, Minerva Park, OH 43229

Tainter Gate Parallel Shaft Speed Gear
Post-Bid
Delaware, OH 43015

Village of Crooksville Reservoirs No. 1 and No. 2 Dam Breach Project
Results
Less than $250,000 est. value
Crooksville, OH 43731

Youngstown Dam Removals Project
New Construction
Post-Bid
Youngstown, OH

Southeast Dam Package - Veto Lake Dam Rehabilitation Project
Results
Less than $3,201,879 est. value
Belpre, OH 45714

2020 Pedestrian Tunnel Maintenance
Renovation
Post-Bid
$540,000 est. value
Dublin, OH

Southeast Dam Package - Tycoon Lake Dam Rehabilitation Project
Results
Less than $3,201,879 est. value
Belpre, OH 45714

Hoover Dam Improvements- Part 1
Results
Less than $15,381,250 est. value
Columbus, OH

Statewide Dam Improvements CMAR
Results
Less than $17,930,000 est. value
Celina, Circleville, Lake Milton, Van Buren, OH

Last Updated 03/12/2021 10:26 AM
Project Title

2020 Pedestrian Tunnel Maintenance - Carnoustie Drive North of Aryshire Drive

Physical Address View project details and contacts
City, State (County) Dublin, OH 43016   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Dublin has programmed the removal of the existing deteriorated stone facade/slope face at both ends of the pedestrian tunnel located on Carnoustie Drive north of Aryshire Drive. Cast-in-place retaining walls are proposed to replace the existing stone facade retaining walls, which will require the existing mitered tunnel pipe ends to be removed and replaced with a standard 108-inch diameter concrete pipe, 8 feet in length - which is not mitered. The face of the retaining walls will be at the end of the standard concrete pipe. The proposed retaining walls will likely be a straight alignment. The retaining walls will have synthetic stone applied to exposed surfaces. The new pipe will have a concrete paved invert. The entire tunnel interior, both new and existing pipe, will be surfaced prepared, sealed, and painted on exposed surfaces. The existing timber guardrail on both sides of Carnoustie Drive will be removed and replaced with steel-back timber guardrail.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents