Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 715/ 611 Intersection
Infrastructure
Design
$9,330,537 CJ est. value
Henryville, PA 18332

SR 715 over Pocono Creek
Demolition, New Construction, Infrastructure
Design
$3,855,006 CJ est. value
Henryville, PA 18332

2023 Monroe County Green Light Go Adaptive Signal Control Project
Infrastructure
Bidding
$400,000 CJ est. value
Stroudsburg, PA 18360

2023 Sanitary Sewer Manhole Rehabilitation Project
Infrastructure
Bidding
$100,000 CJ est. value
Pocono Township, PA 18332

PMREMS Building Expansion and Renovation - Rebid
Addition, Demolition, Renovation, Infrastructure - 4,041 SF
Post-Bid
$2,484,000 CJ est. value
Tobyhanna, PA 18466

Siteworks Requirements Contract
Infrastructure
Post-Bid
East Stroudsburg, PA

Northgate Elevated Water Storage Tank Rehabilitation Project
Renovation, Infrastructure
Results
$525,200 CJ est. value
Stroudsburg, PA 18360

Northgate Elevated Water Storage Tank Rehabilitation Project
Renovation, Infrastructure
Results
$525,200 CJ est. value
Stroudsburg, PA 18360

Black Buffalo 3D Corporation
Demolition, New Construction, Infrastructure - 131,250 SF
Pending Verification
$35,700,000 CJ est. value
Smithfield Township, PA 18301

Margaritaville Resort Village Pocono Mountains
Demolition, New Construction, Infrastructure
Pending Verification
$1,300,000,000 CJ est. value
Pocono Manor, PA 18349

209 BUS (SR 2012) Mt Tom
Infrastructure
Conception
$2,759,780 CJ est. value
East Stroudsburg, PA 18301

Giant Food Stores / Pocono Summit
New Construction, Infrastructure - 66,000 SF
Design
$17,000,000 CJ est. value
Pocono Summit, PA 18346

2022 Road Project
Infrastructure
Post-Bid
$500,000 CJ est. value
East Stroudsburg, PA 18302

Last Updated 08/14/2023 12:08 PM
Project Title

Pocono Auxiliary Water Tank

Physical Address View project details and contacts
City, State (County) Swiftwater, PA 18370   (Monroe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,398,357 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 27, 2023, this project has been awarded to DN Tanks Inc.** As of March 22, 2023, the project has not been awarded, it is expected to be awarded in March 2023. 19-1526.001 The project involves furnishing all plant, labor, materials, etc. and performing all work necessary and/or required to complete the construction of a new 1.7M Gallon Pre-Stressed Concrete Water Storage Tank and all associated Site Work. Question Deadline 02/03/2023 at 3:00 PM ET Mr. Borger mentioned that all questions shall be submitted in writing via the Clarifications Section on the PennBid website No bid will be considered unless it is accompanied by a certified check, money order or Bid Bond in an amount equal to ten percent (10%) of the total Bid. The Bid Security shall be made payable to Brodhead Creek Regional Authority. All Bid Bonds must be accompanied by a Power of Attorney or suitable letter of commitment from a Pennsylvania licensed surety company as described in the Instructions to Bidders and Specifications. The Bidder and its selected major Subcontractors shall include the fully completed Non-Collusion Affidavit along with the other forms required by the Specifications with the Bid. Restrictions relative to submission, change or withdrawal of bids are established in the Specifications and follow Pennsylvania Public Contract Law. The project is financed in part by a grant from the Commonwealth Financing Authority and sponsored by the Monroe County Industrial Development Authority. Except as permitted by law, the Owner shall award the Contract to the lowest Responsible Bidder or reject all bids within sixty (60) days from the date of Bid opening; and no bidder may withdraw his Bid before the expiration of such 60-day period; provided however that if the Award is delayed by the required approval of another Government agency, the sale of bonds, the award of a grant or grants, the Owner shall reject all Bids or Award the Contract to the lowest Responsible Bidder within one hundred twenty (120) days from the date of Bid opening, and no bidder may withdraw his Bid prior to the expiration of such 120-day period. Thirty (30) day extensions of the date for the Award may be made by the mutual written consent of the Owner and the lowest Responsible Bidder. The Brodhead Creek Regional Authority reserves the right to reject any or all bids, or portion thereof, and to waive any informalities and to accept any bid that it may deem to be in the best interest of the Authority.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents