Similar Projects
Slate Valley Walking Trail
New Construction - 3,600 SF
Design
Less than $15,000 est. value
Poultney, VT 05764

Pearl Street Sidewalk Reconstruction
Bidding
Johnson, VT 05656

Waterville Elementary School Parking Lot Resurfacing
Bidding
Waterville, VT 05492

Slip Formed Concrete Curbing 2020
Post-Bid
Rutland, VT

STP CVRT(2) - Winooski River Bridge and Bike Path Construction
Post-Bid
Montpelier, VT

Milton STP BP16(10) (US Route. 7 Gap Project)
Results
$970,995 est. value
Essex Junction, VT

West Rutland Sidewalk Segments STP BP15(1)
Results
$500,000 to $1,000,000 est. value
West Rutland, VT 05777

2021 Sidewalk Improvements
Bidding
Springfield, VT

IQ004 Indefinite Delivery / Indefinite Quantity Primary Contracts –Contractor On-Ramp
Post-Bid
Montpelier, VT 05633

Vermont Route 7 Milton Streetscape Project - South
Results
$324,720 est. value
Milton, VT

Sidewalk to Missisquoi Valley Union High School Swanton STP BP19(5)
Post-Bid
Swanton, VT

Design and Construction of Foot Trail at Taconic Mountain Ramble State Park
Results
$25,000 est. value
Hubbardton, VT 05743

Lyndon Town School Sidewalks
Post-Bid
Lyndonville, VT 05851

Kocher Drive - STP Sidewalk (12) and STP BP18(014)
Results
$500,000 to $1,000,000 est. value
Bennington, VT 05201

Concrete Sidewalk Installation
Post-Bid
Rutland, VT 05702

Last Updated 11/07/2019 11:49 AM
Project Title

Sidewalk Replacement Fair Haven Rest Area

Physical Address View project details and contacts
City, State (County) Fair Haven, VT   (Rutland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of, but is not limited to job meetings, submittals, removal and disposal of existing brick and granite pavers and subbase, complete removal of two trees, subbase excavation and installation of new gravel base and installation of new concrete sidewalks. Limits of new concrete sidewalk will be the same as the existing brick pavers. Fencing and/or barricades will be required to protect both construction work and the public. Cleanup, topsoil, seeding, and mulching will be done as soon as possible. Including repairs, grading, seeding and mulching as needed. Sidewalk work shall consist of constructing sidewalks of Portland Cement Concrete s on a prepared subgrade.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents