Similar Projects
Apex Community Downtown Streetscape and Parking
Design
Apex, NC 27502

Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Design
$2,000 to $5,000,000 est. value

NCSU Electrical Distribution
Renovation
Bidding
$47,211,000 est. value
Raleigh, NC

Carmichael Gymnasium Addition and Renovation
Post-Bid
$45,000,000 est. value
Raleigh, NC 27607

NOAA Tenant Improvements
Post-Bid
Raleigh, NC 27606

RTP Campus - General Classroom Building 2
Results
Less than $43,994,800 est. value
Raleigh, NC

Dabney Hall Evaluation and Upgrade Phase 2 METRIC Renovation
Renovation
Results
Raleigh, NC

Academic Success Center at DH Hill Library
Renovation - 40,000 SF
Construction
$9,300,000 est. value
Raleigh, NC

Design Build for Restoration of Memorial Belltower
Construction
Less than $6,100,000 est. value
Raleigh, NC

Architecture Project Management Tupper Memorial Hall Rehabilitation
Renovation
Post-Bid
Raleigh, NC 27601

Elevator Additions - Tucker and Owen Residence Halls
Results
$1,400,000 est. value
Raleigh, NC 27695

WTCC - Building NR - Automotive and Collision Repair Facility
New Construction - 100,653 SF
Construction
Raleigh, NC 27616

Lab and Building Systems Renovations to Varsity Research Building
Renovation - 15,200 SF
Post-Bid
Raleigh, NC 27606

Reedy Creek Road Improvements Construction Engineering and Inspection Services
Results
Less than $9,106,431 est. value
Cary, NC

Wake Tech Community College RT2
New Construction - 66,000 SF
Construction
Morrisville, NC 27560

Reported 12/11/2019 03:33 PM
Project Title

NCSU Fountain Dining Hall

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27695   (Wake County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of selective areas in NCSU Fountain Dining Hall includes Dyrwall, Tile, ACT, Paint, and selective demo.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents