Similar Projects
Last Updated | 12/08/2022 06:05 PM |
Project Title | Lake Erie State Park Utility Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Brocton, NY 14716 (Chautauqua County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Park/Playground, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,566,262 [brand] Estimate |
Plans Available from | Electrical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Upgrade the electrical and water distribution systems. The electrical system is a combination of older 480/240V, 1 Ph distribution on the eastern portion of the park, and a newer 4.8 kV, 1 Ph distribution on the northwest area. This project will provide a new 4.8 kV design to replace the old 480V system, with condition assessment and repair of the existing 4.8 kV system components. This will unify the two systems into a single 4.8 kV distribution system for the entire park. The existing water system will be replaced from the existing distribution supply connection to the distribution mains throughout the park. Work will include the upgrade or replacement of existing water main, manholes, and valves along with added water supply features and new winterization appurtenances. Work includes sanitary dump station removal and replacement. All Requests for Information (RFIs) are due by: 3:00 PM on Friday, November 11, 2022 The project cost estimate is $3,400,000 to $4,600,000. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |