Similar Projects
2022-2023 Capital Improvement Program - Contract #3- HVAC Construction
Renovation
Sub-Bidding
$1,797,500 CJ est. value
East Moriches, NY 11940

Replace Walk-In Coolers & Freezer, Building 80
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Dix Hills, NY 11746

HVAC Equipment Replacement at Longwood High School
Renovation
Post-Bid
$300,000 CJ est. value
Middle Island, NY 11953

Metal Duct-Work Fabrication
Term Contract
Post-Bid
Lake Ronkonkoma, NY

Replacement of Air-Handlers
Alteration
Results
Smithtown, NY 11787

James E. Allen Alternative School Roof Top Unit and Unit Ventilator Replacement
Alteration
Results
Wheatley Heights, NY 11798

Chimney Lining/Wood Stove Installation
Renovation
Sub-Bidding
$80,000 CJ est. value
Fishers Island, NY 06390

HVAC Repairs and Services
Alteration
Post-Bid
Southampton, NY

Training Building New 3-Bay Substation Contract H - HVAC Construction Work
New Construction, Infrastructure
Results
$484,400 CJ est. value
Central Islip, NY 11722

First Floor Unit at Southampton Ventilator Replacement
Renovation
Sub-Bidding
$1,000,000 CJ est. value
Southampton, NY 11968

Kitchen Hood Fire Suppression Systems - Inspection Maintenance and Repair
Term Contract
Post-Bid
Riverhead, NY

Lindenhurst Union Free School District 2017 Bond Issue Related CIP Phase 10 - HVAC Construction
Alteration
Results
Lindenhurst, NY 11757

HVAC Chiller Repair - Carrier and Trane Equipment
Alteration
Post-Bid
Ronkonkoma, NY

Maintenance Service for Pneumatic and DDC Control Systems
Alteration
Results
West Islip, NY

Byron Lake Pool Reconstruction - HVAC
Renovation
Post-Bid
$200,000 CJ est. value
Oakdale, NY 11769

Last Updated 10/11/2023 11:05 AM
Project Title

Boiler Replacement - Rebid at Huntington Manor Headquarters Contract M - Mechanical Construction Work

Physical Address View project details and contacts
City, State (County) Huntington Station, NY 11746   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Fire District Headquarters Boiler Replacement - Contract M- Mechanical Construction Work Each proposal submitted must be accompanied by a certified check or bid bond, made payable to the "Hunt - ington Manor Fire District " , in an amount equal to five percent (5%) of the total amount ofthe bid, as a com - mitment by the bidder that, if its bid is accepted, it will enter into a con - tract to perform the work and will ex - ecute such further security as may be required for the faithful performance of the contract. CERTIFICATION OF BONDING COMPANY IS RE - QUIRED FOR THIS BID, SEE IN - STRUCTIONS FOR BIDDERS. Each bidder shall agree to hold his/her bid price for forty-five (45) The Contract will be awarded to the lowest responsible Bidder or the pro - posals will be rejected within 45 days of the date of opening proposals, sub - ject however, to the discretionary right reserved by the Fire District to waive any or all proposals and to ad - vertise for new proposals if, in its opinion, the best interest of Fire District will thereby be promoted. No bid - der shall withdraw its Bid within 45 days after the formal opening thereof. Thereafter, a bidder may withdraw its Bid only in writing and in advance of the actual award. Document note : Checks or money or - ders shall be made payable to the HUNTINGTON MANOR FIRE DIS - TRICTshould be sent directly to REVplans. Bidder's deposit will be refunded ifthe set is returned to REV in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such drawings and specifications. Non-bidders shall re - ceive partial reimbursement, in an amount equal to the amount ofthe de - posit, less the actual cost ofreproduc - tion of the documents if the set is returned in good condition within thirty (30) days following the award of the contract or the rejection ofthe bids covered by such plans and specifications. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Please note REVplans (melville.h2mplanroom.com ) is the designated location and meansfor dis - tributing and obtaining all bid pack - age information. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. The Providertakes no respon - sibility for the completeness of Con - tract Documents obtained from other sources. Contract Documents obtained from other sources may not be accu - rate or may not contain addenda that may have been issued. All bid addenda will be transmitted to registered plan holders via email and will be available at melville.h2mplanroom.com. Plan holders who have paid for hard copies ofthe bid documents will need to make the determination ifhard copies of the addenda are required for their use and coordinate directly with the printerfor hard copies ofaddenda to be issued. There will be no charge for registered plan holders to obtain hard copies ofthe bid addenda questions shall be submitted in writing to: H2M architects + engineers John Lahey, PE - Senior Project Engineer 538 Broad Hollow Road, 4 th Floor East, Melville, New York 11747 Phone: (631) 756-8000 Ext. 1553 Fax: (631) 694-4122 e-mail: Jlahey@h2m.com

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents