Similar Projects
PS/IS 288
Renovation
Conception
$2,400,000 est. value
Brooklyn, NY 11224

Castle Island Montessori School Relocation
Renovation - 6,400 SF
Design
Albany, NY 12207

New District 31 Elementary School
New Construction
Design
Staten Island, NY 10314

District Maintenance Building
Renovation
Bidding
Islip Terrace, NY 11752

Batavia CSD 2020 - Vision Capital Improvement Project Phase 2 - 2021-2022 Capital Outlay Project
Renovation
Bidding
$2,200,000 est. value
Batavia, NY 14020

Peru CSD - 2018 Capital Project - Phase 3
Post-Bid
Less than $4,603,000 est. value
Peru, NY 12972

Clarkstown CSD Time and Materials Project
Post-Bid
New City, NY 10956

Liberty Central School District Elementary School - Gymnasium Improvements
Results
Liberty, NY 12754

Hutchinson Elementary School Project: Construction of New School Building, Demolition of Existing School and Demolition of Modular Building
New Construction, Demolition
Results
Pelham, NY 10803

Beekman CSD - Additions and Alterations Phase III
Construction
$6,625,000 est. value
West Chazy, NY

Germantown C.S.D. 2015 Capital Projects
Construction
Germantown, NY

Arverne Senior Homes and Charter School
New Construction - 186,000 SF
Pending Verification
$37,000,000 est. value
Queens, NY 11692

German School Manhattan
Build-Out - 3,600 SF
Pending Verification
New York, NY 10007

Mamaroneck UFSD - 2019 Bond Referendum - Capital Improvements at Murray Avenue School
Renovation
Bidding
Larchmont, NY 10538

Clarkstown CSD Time and Materials Project
Post-Bid
New City, NY 10956

Last Updated 12/29/2021 05:27 AM
Project Title

Goosehill Primary School

Physical Address View project details and contacts
City, State (County) Cold Spring Harbor, NY 11724   (Suffolk County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract #1 - Window Replacement, Contract #2- General Construction, Contract #3- Plumbing Reconstruction, Contract #4- HVAC Reconstruction, Contract #5- Electrical Reconstruction The Work section consists of the provision of all plant, materials, labor and equipment and the like necessary and/or required for the complete execution of the concrete, forms, reinforcing and finishing work for this project as required by the schedules, keynotes and drawings, including but not limited to the following: 1. Provide foundation systems including walls, individual continuous footings, piers, grade beams, pits and the like as may be required to complete the foundation work of this project. 2. Provide floor slabs on grade including mesh reinforcement, vapor barriers, jointing systems and the like. 3. Provide structural concrete on metal decking, if applicable, for supported floors, reinforce and finish as required.

Details

Elementary School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents