Similar Projects
I-5/179th Street Interchange - Interchange Improvements
Infrastructure
Conception
$42,001,000 CJ est. value
Tacoma, WA 98409

I-5/SB over I-705 and RR - Special Repairs
Infrastructure
Conception
$750,000 CJ est. value
Tacoma, WA 98418

I-5/Denny Way - Lakeview Viaduct - Deck Overlay and Expansion Joint
Infrastructure
Design
$26,186,000 CJ est. value
Tacoma, WA 98409

Sixth Avenue Apartment Development
New Construction, Infrastructure
Design
$150,880,000 CJ est. value
Tacoma, WA 98406

Edison, Whitman, Lincoln Safe Routes to Schools - REBID
Infrastructure
Bidding
$1,366,850 CJ est. value
Tacoma, WA 98405

White River School District Glacier Middle School Site Improvements - Part 3 o 3
Infrastructure
Bidding
$700,000 CJ est. value
Buckley, WA 98321

Oil Water Separators Maintenance Contract
Infrastructure
Post-Bid
Tacoma, WA 98433

VA American Lake Phase 2 Site Development
Demolition, Term Contract, Infrastructure, Alteration
Post-Bid
$10,000,000 to $25,000,000 est. value
Tacoma, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Results
$350,000 est. value
Tacoma, WA 98402

Point Defiance Zoo and Aquarium South Pacific Aquarium Tank and Exhibit Improvements
Renovation, Infrastructure
Construction
$3,736,964 CJ est. value
Tacoma, WA 98407

Point Defiance Zoo and Aquarium South Pacific Aquarium Tank and Exhibit Improvements
Renovation, Infrastructure
Construction
$3,736,964 CJ est. value
Tacoma, WA 98407

Frederickson Self Storage
New Construction, Infrastructure - 95,000 SF
Pending Verification
$10,300,000 CJ est. value
Tacoma, WA 98446

Marcos Marine View Subdivision
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Tacoma, WA 98422

I-5 / I-5 Over NE 78th St - Replace Expansion Joints
Infrastructure
Conception
$1,042,000 CJ est. value
Tacoma, WA 98409

Last Updated 03/01/2023 09:39 AM
Project Title

Penrose Point State Park - On-Site Sewage System Upgrades Rebid

Physical Address View project details and contacts
City, State (County) Lakebay, WA 98349   (Pierce County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $687,318 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: This project includes demolition of a gravel filter bed and providing advantex Filter system, installa-tion of gravity sewer lines, installation of effluent force mains, installation of septic tanks, instal-lation of sewer aeration systems, duplex effluent pumps, updated controls, and a conduit for future communication installation. Work shall include providing ancillary items including but not limited to stormwater BMPs, equipment, tools, labor, site restoration, and miscellaneous materials as needed to provide a complete and usable facility. ESTIMATED BID RANGE: $620,000 - $690,000 Bidder Responsibility will be evaluated for this project. In determining bidder responsibility, the Owner shall consider an over-all accounting of the criteria set forth in Division 00 --- instructions To Bidders. Please direct ques-tions regarding this subject to the office of the Engineer. Voluntary numerical MWBE goals of 10% MBE and 6% WBE have been established for this project. Achievement of these goals is encouraged. Bidders may contact the Office of Minority and Women's Business Enterprise to obtain information on certified firms. Technical questions regarding this project must be directed to Sant Ho, Project Representative at telephone (360) 725-9757, or via email at sanh.ho@parks.wa.gov Washington State Parks reserves the right to accept or reject any or all proposals and to waive informalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents