Similar Projects
Mixed-Use Development
New Construction - 204,000 SF
Conception
$10,000,000 CJ est. value
Alexandria, VA 22314

Mixed-Use Development
New Construction - 204,000 SF
Conception
$10,000,000 CJ est. value
Alexandria, VA 22314

TideLock
New Construction, Renovation - 37,000 SF
Design
$80,000,000 est. value
Alexandria, VA

Walmart Supercenter #5753-231 - Sprb-R
Renovation - 83,895 SF
Design
Alexandria, VA 22306

2nd Floor Space Courthouse Square
Renovation - 10,238 SF
Post-Bid
$331,000 est. value
Alexandria, VA 22314

Walmart 0-2--TENANTBID--2021 - Bundle #2
Renovation
Post-Bid

Public Safety Center (PSC) Kitchen Renovation
Renovation
Results
$380,000 est. value
Alexandria, VA 22314

1700 Diagonal Road- Seventh Floor
Renovation - 5,500 SF
Construction
$500,000 est. value
Alexandria, VA 22314

Atkins North America
Renovation - 19,500 SF
Construction
$485,000 est. value
Alexandria, VA 22314

Carlyle Block P - South Tower
New Construction - 246,223 SF
Pending Verification
Alexandria, VA 22314

Carlyle Park Towers - Block 32
New Construction, Renovation
Pending Verification
$10,000,000 CJ est. value
Alexandria, VA 22314

Royal Street Mixed-Use Development
New Construction
Conception
Alexandria, VA 22314

CorePower Yoga
Renovation - 3,685 SF
Post-Bid
$650,000 est. value
Alexandria, VA 22314

Oakville Triangle- Block A & B
New Construction
Construction
Alexandria, VA 22301

Del Ray Mixed Use
New Construction - 88,500 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Alexandria, VA 22301

Last Updated 05/03/2022 09:54 AM
Project Title

515 King Street

Physical Address View project details and contacts
City, State (County) Alexandria, VA 22314   (Alexandria City County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Fitness Center, Office, Retail
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Various capital improvements includes renovating the lobby and ground-floor retail area, upgrading co-working spaces and adding a fitness facility.

Details

Retail, Renovation, Office, Renovation, Fitness Center, Renovation, 4 Stories Above Grade, 74,824 SF Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents