Similar Projects
Main Water Loop
Infrastructure
Design
$2,000,000 to $5,000,000 est. value
Asheville, NC 28805

Main Water Loop
Infrastructure
Design
$2,000,000 to $5,000,000 est. value
Asheville, NC 28805

Water Main Relocation Bridge No.9 Over Connaritsa Swamp (SR1219) Francis Mill Road
Infrastructure
Bidding
NC

Queens Road West Water Main Replacement
Infrastructure
Bidding
Charlotte, NC

Shallotte Transmission Water Line
Post-Bid
Bolivia, NC 28422

USDA Water and Sewer Improvements Contract 1 - Water Main Improvements Contract 2 - Sanitary Sewer Improvements
Post-Bid
West End, NC 27376

2017 Water and Sewer System Improvements
Results
Pine Level, NC 27568

Design Build Services for a 24-Inch Water Main Extension
Results
Less than $7,267,250 est. value
Concord, NC 28026

Liberty Road Water and Sewer Improvements Phase III
Infrastructure
Bidding
Greensboro, NC 27497

USDA Water and Sewer Improvements Contract 3 - Elevated Storage Tank
Post-Bid
West End, NC 27376

2020 Water System Improvements Lakeshore Drive
Results
$350,000 to $450,000 est. value
Dunn, NC 28334

Town of Seaboard Contract No. 2 - Small Diameter Water Line Replacement
Infrastructure
Bidding
Seaboard, NC 27876

USDA Water and Sewer Improvements Contract 4 - Water Meter Replacement
Post-Bid
West End, NC 27376

J--Water System Deficiencies
Results
$50,000 to $100,000 est. value
Frisco, NC

3/4" Copper Pipe
Infrastructure
Bidding
Greensboro, NC

Reported 03/11/2022 12:00 AM
Project Title

Drinking Water System Improvements

Physical Address View project details and contacts
City, State (County) Hookerton, NC   (Greene County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,517,835
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work is: 3,300 lf of 8” C900 PVC Water Main with Tracer Wire (open cut) ·7,900 LF of 6” C900 PVC Water Main with Tracer Wire (open cut) ·2,000 LF of 2” C900 PVC Water Main with Tracer Wire (open cut) ·Installation of 16 new fire hydrants ·Removal and stockpiling of 16 existing fire hydrants ·Installation of approximately 65 new water distribution isolation gate valves ·Installation of approximately 160 new ¾” water services with meter boxes and connection to existing services at the right of way ·Abandonment of existing distribution system as made possible by the above proposed installed measures

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents