Similar Projects
Urban Grading, Curb and Gutter, ADA, Signals, Storm Sewer, Lighting, AC Surfacing
Infrastructure
Conception
$15,094,000 CJ est. value
Harrold, SD 57536

Urban Grading, Curb and Gutter, ADA, Signals, Storm Sewer, Lighting, AC Surfacing
Infrastructure
Conception
$15,094,000 CJ est. value
Harrold, SD 57536

Install Cured in Place Pipe Lining in Condenser Water Piping
Term Contract
Design
Pierre, SD 57501

Install Cured In Place Pipe Lining in Second Floor Sewer Piping, Federal Building/PO/CH
Renovation, Infrastructure
Design
$100,000 CJ est. value
Pierre, SD 57501

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Access Road Construction
Infrastructure
Results
SD

Access Connection/Road Improvement - Cow Creek Recreation Area
Infrastructure
Construction
$275,952 CJ est. value
Pierre, SD 57501

Access Connection/Road Improvement - Cow Creek Recreation Area
Infrastructure
Construction
$275,952 CJ est. value
Pierre, SD 57501

T.F. Riggs High School Athletics Addition - Pierre School District
Addition, Demolition, Infrastructure
Pending Verification
$9,300,000 CJ est. value
Pierre, SD 57501

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$4,711,000 CJ est. value
Harrold, SD 57536

Underground Infrastructure Inspection
Infrastructure
Post-Bid

2022 Pipe, Valves, Fittings and Hydrants
Infrastructure
Results
Pierre, SD

Steamboat Park Development - City of Pierre
Infrastructure
Conception
$2,000,000 CJ est. value
Pierre, SD 57501

Last Updated 01/13/2023 08:09 AM
Project Title

Mill, AC Resurfacing, Pipe Work

Physical Address View project details and contacts
City, State (County) Harrold, SD 57536   (Hughes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $1,319,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SD34, SD34 EBL & WBL - Fm Cleveland Ave to Farm Island Rd in Pierre Length 1.8 As of January 13, 2023, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Mill, AC Resurfacing, Pipe Work *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents