Similar Projects
Towson Avenue - Garrison to Zero Street - City of Fort Smith
Infrastructure
Conception
$2,000,000 CJ est. value
Fort Smith, AR 72901

Sebastian Hills
New Construction
Design
Fort Smith, AR 72903

Concrete Pad
Infrastructure
Design
$250,000 CJ est. value
Fort Smith, AR 72903

Carol Ann Cross Park Improvements
Infrastructure
Bidding
$1,100,000 CJ est. value
Fort Smith, AR 72903

2022 Capital Improvements Program, Street Overlays / Reconstruction, Phase A
Infrastructure
Bidding
$200,000 CJ est. value
Fort Smith, AR 72901

Downtown Development Services and Main Street Program
Renovation
Post-Bid
Fort Smith, AR

Rehabilitation of Five (5) Single Family Dwellings
Renovation
Post-Bid
Fort Smith, AR

Emergency Management and Public Safety Facility Parking Lot Improvements
Infrastructure
Results
$132,865 CJ est. value
Fort Smith, AR 72903

Construction of CMTC Bridge 021 Repair
Infrastructure
Results
$129,325 CJ est. value
Lavaca, AR 72941

Wells Lake Cottages
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Fort Smith, AR 72904

Wells Lake Cottages
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Fort Smith, AR 72904

2016 Sanitary Sewer Assesment (SSA) Remedial S007 (Construction) - City of Fort Smith
Infrastructure
Design
$6,000,000 CJ est. value
Fort Smith, AR 72904

2022 Capital Improvements Program, Street Overlays / Reconstruction, Phase F
Infrastructure
Bidding
$200,000 CJ est. value
Fort Smith, AR 72901

Community Development Block Grant Program - Rehabilitation of Six Single Family Dwellings
Renovation
Post-Bid
$43,000 est. value
Fort Smith, AR

Cmtg 2200j Motor Pool Addition
Infrastructure
Results
$796,450 CJ est. value
Fort Smith, AR 72916

Last Updated 11/09/2022 09:44 AM
Project Title

Construction Services to Build Two (2) Single-family Transitional Homes

Physical Address View project details and contacts
City, State (County) Fort Smith, AR 72901   (Sebastian County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected September 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

*As of March 3, 2022, a construction manager has been awarded. Consulting services for construction management and construction services to build two (2) single-family transitional homes in the City of Fort Smith, Arkansas. A Selection Committee will review the proposals based on the following criteria: 1. The construction experience and qualifications of the project manager and team in dealing with similar projects with federal funding, including CDBG & HOME programs and local government. 2. Experience of personnel assigned to the project team. 3. Assurance that the identified personnel will actually work on the project. 4. Approach of the construction management & construction to this project. 5. Ability to meet the proposed schedule. 6. Evaluation of references. The firm receiving the highest rating will have the sealed cost proposal opened and the Next Step Day Room officials will begin the negotiation of services and construction. The Next Step Day Room encourages participation of small, minority, and woman owned business enterprises in the procurement of goods, services, and construction, as either a general contractor or subcontractor. It is further requested that whenever possible, majority contractors who require sub-contractors seek qualified small, minority, and woman owned businesses to partner with them. The Next Step Day Room is an Equal Opportunity Employer. To obtain the RFP information packet or for questions relating to the RFP, please contact Sharon Chapman at 479-784-2209. Sharon Chapman, Next Step Day Room

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents