Similar Projects
Eau Claire, N. Clairemont Avenue, Sth 312 To County Line Road
Bidding
Eau Claire, WI 54701

2021 Road Maintenance
Bidding
$280,000 to $340,000 est. value
Middleton, WI

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Greenwood - Spencer, Elm Drive to East County Line
Bidding
Greenwood, Spencer, WI

Village of Dane Southeast Public Works Loop
Post-Bid
Dane, WI

CTH 'G' Street Construction
Results
Egg Harbor, WI 54209

2021 Street and Utility Improvements - North Main Street / CTH MM
Bidding
Oregon, WI 53575

HMA Paving
Post-Bid
Howard, WI

ATV / UTV Trail Construction
New Construction
Results
Lake Wissota, WI 54729

2021 Woodland Drive Extension
Bidding
$300,000 est. value
Beaver Dam, WI 53916

City Wide Street Chip Sealing
Post-Bid
Eau Claire, WI

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

Last Updated 02/12/2021 11:20 PM
Project Title

Village of Plover, Post Road, Springville Drive - Tommy's Turnpike, Village of Plover, Post Road, Springville Drive - Tommy's Turnpike

Physical Address View project details and contacts
City, State (County) Plover, WI 54467   (Portage County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 40,538 CY; Excavation Marsh, 3,000 CY; Backfill Granular, 20,560 CY; Base Aggregate Dense, 21,182 Ton; Base Aggregate Open Graded, 200 Ton; Concrete Pavement, 25,764 SY; Marking Epoxy, 68,470 LF; Construction Staking, 37,508 LF; Construction Staking, 149 Each; Construction Staking, 4 LS; Conduit, 3,740 LF; Culvert Pipe, 56 LF 24”; Storm Sewer Pipe, 1,927 LF 12“, 359 LF 36“, 1,526 LF 18“, 221 LF 42“, 2,387 LF 24“, 311 LF 30”; Concrete Curb and Gutter, 14,764 LF; Concrete Sidewalk, 100,581 SF; Beam Guard, 60 LF; Asphaltic Surface, 1,966 Ton; HMA Pavement, 665 Ton; Tack Coat, 176 Gals; Signs, 247 SF; Pit Run, 2,360 CY; Concrete Driveway, 1,850 SY; Precast Concrete Box Culvert, 128 LF; Chain Link Fence, 824 LF; Light Poles, 21 Each; Water Main Pipe, 719 LF; Water Service, 1,719 LF; Sanitary Lateral, 66 LF; Sanitary Sewer, 57 LF; Hauling and Disposal of Contaminated Soil, 17,830 Ton.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 26 - Electrical, Lighting.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Culverts, Storm Drainage Structures.
Division 34 - Transportation, Guideways/Railways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents