Similar Projects
Median Crossover Construction - TH 35
Infrastructure
Conception
$940,000 CJ est. value
Annandale, MN 55302

Median Crossover Construction - TH 35
Infrastructure
Conception
$940,000 CJ est. value
Annandale, MN 55302

Reconstruction
Infrastructure
Design
$9,100,000 CJ est. value
Buffalo, MN 55313

Reconstruction
Infrastructure
Design
$9,100,000 CJ est. value
Buffalo, MN 55313

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Jeske Ave Overlays
Infrastructure
Bidding
$900,000 CJ est. value
Corinna Township, MN 55302

TH 24/Hemlock Street Roundabout and Hemlock Street Full Depth Reclamation
Infrastructure
Post-Bid
$2,269,748 CJ est. value
Annandale, MN 55302

TH 24/Hemlock Street Roundabout and Hemlock Street Full Depth Reclamation
Infrastructure
Post-Bid
$2,269,748 CJ est. value
Annandale, MN 55302

2021 Street Improvements Project
Results
Maple Lake, MN

2021 Street Improvements Project
Results
Maple Lake, MN

Advanced Volumetric Alliance Factory
New Construction, Infrastructure - 180,000 SF
Construction
$10,000,000 CJ est. value
Albertville, MN

CSAH 37 Reconstruction Project
Infrastructure
Construction
$6,789,521 CJ est. value
Maple Lake, MN 55358

Monticello Meadow Townhomes
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Monticello, MN 55362

Monticello Meadow Townhomes
New Construction, Infrastructure
Pending Verification
$35,000,000 CJ est. value
Monticello, MN 55362

West City Line to CSAH 2 - Wright County
Infrastructure
Conception
$522,000 CJ est. value
Maple Lake, MN 55358

Last Updated 03/03/2023 03:33 AM
Project Title

WWTF Biosolids Improvements

Physical Address View project details and contacts
City, State (County) Albertville, MN 55301   (Wright County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sewage Treatment Plant, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $10,421,700 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Waste Water Treatment Facility (WWTF) Biosolids Improvements 1. Decommissioning of the existing beds and disposal of all solids (including biosolids, sand, and gravel), PVC liner and soils removed. 2. Construction of a new biosolids dewatering building and repurposing the existing foundation of beds to be used as the footing of the new building. 3. Installation of dewatering screw presses and all associated equipment for a fully functional dewatering system. 4. Construction of a new electrical building and new electrical service from the utility. 5. Grading, paving, sanitary piping, stormwater piping, misc. improvements. 6. Construction of a septage receiving station. 7. Replacement of the oxidation ditch equipment.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents