Similar Projects
Extra Hand Storage
New Construction - 144,836 SF
Conception
$10,000,000 CJ est. value
Miami, FL

Cypress Lake United Methodist Church Multipurpose Facility
New Construction, Addition - 18,262 SF
Conception
$500,000 to $1,000,000 CJ est. value
Fort Myers, FL

Safe & Secure Self Storage
New Construction - 220,100 SF
Design
$10,000,000 CJ est. value
Oakland Park, FL 33311

Airport Commerce Center
New Construction - 656,000 SF
Design
$10,000,000 CJ est. value
Orlando, FL 32824

FPL Indian River Service Center - Phase IV, V, VI
New Construction - 44,616 SF
Bidding
$5,000,000 to $10,000,000 CJ est. value
Vero Beach, FL 32966

Nona Cove Retail/Self-Storage Facility
New Construction - 28,876 SF
Bidding
Orlando, FL 32832

Village Grande Climate-Controlled Storage
New Construction - 100,032 SF
Sub-Bidding
Altamonte Springs, FL 32714

Pre-Fabricated Metal Building at GTLWWTP Design Build
New Construction - 8,265 SF
Post-Bid
$1,300,000 est. value
Fort Lauderdale, FL 33316

Dickens Annex Sheds
Post-Bid
Wewahitchka, FL 32465

Maintenance Facility Repairs (Warehouse # 3)
Results
Less than $50,000 est. value
Miami, FL 33155

Traffic Division - Metal Shed
Results
FL

Boston Whaler Expansion
New Construction - 326,000 SF
Construction
$42,000,000 est. value
Edgewater, FL 32141

Jetscape Westside Development
New Construction - 121,287 SF
Construction
$20,000,000 est. value
Fort Lauderdale, FL 33315

Palma Sola Commercial
New Construction - 121,352 SF
Pending Verification
$10,000,000 CJ est. value
Bradenton, FL

Pasco Maximus Self Storage
New Construction - 360,426 SF
Pending Verification
$10,000,000 CJ est. value
Zephyrhills, FL 33544

Last Updated 09/02/2021 08:03 AM
Project Title

Martin Downs Generator Storage Barn

Physical Address View project details and contacts
City, State (County) Stuart, FL   (Martin County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $366,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of a 200’ x 60’ pre-engineered metal building with an adjacent coquina rock drive. The project also includes all associated grading, drainage, and landscaping work

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents