Similar Projects
Mill Creek Metroparks Gasoline and Fuel Oil
Post-Bid
Canfield, OH

Chemical Inventory
Post-Bid
Bowling Green, OH 43402

East Harbour State Park Marina Fuel System Improvement
Results
Less than $221,700 est. value
Lakeside Marblehead, OH

East Harbor State Park Marina Fuel System Improvement
Results
Less than $309,750 est. value
Lakeside, Marblehead, OH 43440

DPU/DOSD/Surv Lab/ MB Tank
Results
Columbus, OH

Tappan Lake Marina Fuel System Improvements
Results
New Philadelphia, OH 44663

Hueston Woods Marina
Results
Less than $100,000 est. value
College Corner, OH 45003

Argon Tank - Furnish and Install
Results
Columbus, OH

Hamilton Enterprise Park (HEP) Gas Main Loop
Results
Hamilton, OH

FCI ELKTON - Phase 2 - Remove UST
Results
$250,000 to $500,000 est. value
Lisbon, OH

Polyethylene and Fiberglass Stationary Liquid Storage Tanks
Term Contract
Results

SSO 700 STF Disinfection Improvements
Results
Less than $4,000,000 est. value
Cincinnati, OH

Gas Regulator SCADA Conduit Project
Results
Hamilton, OH 45011

Compressed Natural Gas (CNG) Fueling System Services
Results
Less than $546,400 est. value
Columbus, OH 43215

Above Ground Fuel Storage Tank/ Equipment
Results
Riverside, OH 45204

Reported 12/05/2019 12:00 AM
Project Title

Underground Storage Tanks at WPAFB, OH

Physical Address View project details and contacts
City, State (County) Dayton, OH 45433   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project is the replacement and relocation of an existing fuel farm, located at Wright Patterson Air Force Base. Work includes removing seventeen existing underground single-walled fuel storage tanks, with a total capacity of 148,000 gal, and install seventeen double-walled underground storage tanks, all associated piping, and controls. Project will also replace one 2,000 gal above ground liquid propane storage tank with concrete support pad. Relocated fuel farm will include one 25,000 gal tank, three 20,000 gal tanks, one 10,000 gal tank, four 6,000 gal tanks, six 4,000 gal tanks, and two 2,500 gal tanks. Liquid propane tank to be 2,000 gal. Work must be completed while maintaining the partial use of the existing fuel farm to sustain ongoing research efforts. Work includes replacement of the existing 500 square foot manifold building, including oil/water separator and associated storm water piping, power to the facility and exterior lighting, domestic water piping, fire suppression system, HVAC system, perimeter fencing, access drive, sidewalks, and roadway lighting.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents